Revision as of 11:04, 2 August 2011

Teleconference Time: 11:00 a.m. EST'

  • ESNET (Number is 8542553) and EVO session (GlueX Calorimetry meeting room)
  • JLab Phone: in CC F326 is 757-269-6337; JLab Phone in CC L207 is 757-269-7084
  • Athens Phone: in Christina's office is 011-30-210-727-6947
  • Regina Phone: in LB228 is 306-585-4204
  • Phone connection only upon request.
    • +1-866-740-1260 : US+Canada
    • +1-303-248-0285 : International
    • then enter participant code: 3421244# (remember the "#").
    • or www.readytalk.com (and code without the #)

Items for followup from previous meeting(s)

  1. Monitoring
    • Zisis will remind George to send Christina some pricing information for testing of monitoring boards.

Tentative Agenda

  1. Announcements
  2. Review of Action Items
  3. Monitoring
  4. FCAL (notes from Matt)
    1. Construction Status: mechanical, bases
  5. BCAL
    1. Construction Status: builds, fibre QA
  6. Simulations
  7. Beam tests in Hall B (fall 2011)?pdf (Kei)
  8. Any other business

Minutes

Attending:

  1. BCAL Progress
    1. Module 43 build will finish tomorrow; Module 44 build will finish on Friday; on schedule to complete 45 and 46 by August 31.
    2. Machining of Modules 37-40 is done. Inspection will take place tomorrow (Aug. 3) and pickup for the shipment is on August 5 with arrival at JLab on August 8.
    3. Fibre QA of shipment 46: nominal atten len, Npe=7.45 +/- 0.48.
    4. Fibre Shipment 27 arrived on July 29; crate was damaged, fibres boxes inside were ok.