Difference between revisions of "Aug 23, 2011 SiPM Electrical and Cooling"
From GlueXWiki
(→Action Items from previous meetings) |
(→Action Items from previous meetings) |
||
Line 3: | Line 3: | ||
# Decide on cable connections for monitoring cable from Bcal wedge to patch panel. Consider electronics needed for pulsing system (Elton and Fernando) | # Decide on cable connections for monitoring cable from Bcal wedge to patch panel. Consider electronics needed for pulsing system (Elton and Fernando) | ||
# Clarify option of purchase of additional SiPMs (Elton) | # Clarify option of purchase of additional SiPMs (Elton) | ||
+ | # Send optional values for 86KOHm resistor to Chris to investigate delivery times (Jack and Chris) | ||
== Tentative Agenda == | == Tentative Agenda == |
Revision as of 16:50, 16 August 2012
Action Items from previous meetings
- Decide on cable connections for monitoring cable from Bcal wedge to patch panel. Consider electronics needed for pulsing system (Elton and Fernando)
- Clarify option of purchase of additional SiPMs (Elton)
- Send optional values for 86KOHm resistor to Chris to investigate delivery times (Jack and Chris)
Tentative Agenda
- Announcements
- Action Items
- Schedule, reporting, and manpower (Elton)
- SiPM production testing (Yi)
- Mechanical assembly (Jim)
- Temperature compensation (Jack)
- Electronic boards (Chris)
- Light guide gluing setup (Scot via e-mail)
Minutes
Attending: