Difference between revisions of "Aug 23, 2011 SiPM Electrical and Cooling"

From GlueXWiki
Jump to: navigation, search
(Action Items from previous meetings)
(Action Items from previous meetings)
Line 4: Line 4:
 
# Clarify option of purchase of additional SiPMs (Elton)
 
# Clarify option of purchase of additional SiPMs (Elton)
 
# Send optional values for 86KOHm resistor to Chris to investigate delivery times (Jack and Chris)
 
# Send optional values for 86KOHm resistor to Chris to investigate delivery times (Jack and Chris)
 +
# Order micro Dsub connectors to make connections to the monitoring control board (Chris)
  
 
== Tentative Agenda ==
 
== Tentative Agenda ==

Revision as of 16:57, 16 August 2012

Action Items from previous meetings

  1. Decide on cable connections for monitoring cable from Bcal wedge to patch panel. Consider electronics needed for pulsing system (Elton and Fernando)
  2. Clarify option of purchase of additional SiPMs (Elton)
  3. Send optional values for 86KOHm resistor to Chris to investigate delivery times (Jack and Chris)
  4. Order micro Dsub connectors to make connections to the monitoring control board (Chris)

Tentative Agenda

  1. Announcements
  2. Action Items
  3. Schedule, reporting, and manpower (Elton)
  4. SiPM production testing (Yi)
  5. Mechanical assembly (Jim)
  6. Temperature compensation (Jack)
  7. Electronic boards (Chris)
  8. Light guide gluing setup (Scot via e-mail)

Minutes

Attending: