Difference between revisions of "Aug 23, 2011 SiPM Electrical and Cooling"

From GlueXWiki
Jump to: navigation, search
(Tentative Agenda)
Line 11: Line 11:
 
# Action Items
 
# Action Items
 
# Schedule, reporting, and manpower (Elton)
 
# Schedule, reporting, and manpower (Elton)
 +
# mini-Bcal
 +
#* See [https://cebaf.jlab.org/elog/entry/1798611 Log Entry for LED and cosmic pulses]
 
# SiPM production testing (Yi)
 
# SiPM production testing (Yi)
 
# Mechanical assembly (Jim)
 
# Mechanical assembly (Jim)
 
# Temperature compensation (Jack)
 
# Temperature compensation (Jack)
 
# Electronic boards (Fernando and Chris)
 
# Electronic boards (Fernando and Chris)
# Light guide gluing setup  
+
# Light guide gluing setup
  
 
== Minutes ==
 
== Minutes ==
 
''Attending:
 
''Attending:

Revision as of 08:43, 23 August 2012

Action Items from previous meetings

  1. Decide on cable connections for monitoring cable from Bcal wedge to patch panel. Consider electronics needed for pulsing system (Elton and Fernando)
  2. Clarify option of purchase of additional SiPMs (Elton)
  3. Send optional values for 86KOHm resistor to Chris to investigate delivery times (Jack and Chris)
  4. Order micro Dsub connectors to make connections to the monitoring control board (Chris)

Tentative Agenda

  1. Announcements
  2. Action Items
  3. Schedule, reporting, and manpower (Elton)
  4. mini-Bcal
  5. SiPM production testing (Yi)
  6. Mechanical assembly (Jim)
  7. Temperature compensation (Jack)
  8. Electronic boards (Fernando and Chris)
  9. Light guide gluing setup

Minutes

Attending: