Difference between revisions of "Aug 23, 2011 SiPM Electrical and Cooling"
From GlueXWiki
(→Tentative Agenda) |
|||
Line 11: | Line 11: | ||
# Action Items | # Action Items | ||
# Schedule, reporting, and manpower (Elton) | # Schedule, reporting, and manpower (Elton) | ||
+ | # mini-Bcal | ||
+ | #* See [https://cebaf.jlab.org/elog/entry/1798611 Log Entry for LED and cosmic pulses] | ||
# SiPM production testing (Yi) | # SiPM production testing (Yi) | ||
# Mechanical assembly (Jim) | # Mechanical assembly (Jim) | ||
# Temperature compensation (Jack) | # Temperature compensation (Jack) | ||
# Electronic boards (Fernando and Chris) | # Electronic boards (Fernando and Chris) | ||
− | # Light guide gluing setup | + | # Light guide gluing setup |
== Minutes == | == Minutes == | ||
''Attending: | ''Attending: |
Revision as of 08:43, 23 August 2012
Action Items from previous meetings
- Decide on cable connections for monitoring cable from Bcal wedge to patch panel. Consider electronics needed for pulsing system (Elton and Fernando)
- Clarify option of purchase of additional SiPMs (Elton)
- Send optional values for 86KOHm resistor to Chris to investigate delivery times (Jack and Chris)
- Order micro Dsub connectors to make connections to the monitoring control board (Chris)
Tentative Agenda
- Announcements
- Action Items
- Schedule, reporting, and manpower (Elton)
- mini-Bcal
- SiPM production testing (Yi)
- Mechanical assembly (Jim)
- Temperature compensation (Jack)
- Electronic boards (Fernando and Chris)
- Light guide gluing setup
Minutes
Attending: