Difference between revisions of "Aug 23, 2011 SiPM Electrical and Cooling"
From GlueXWiki
(→Tentative Agenda) |
|||
Line 2: | Line 2: | ||
# Decide on cable connections for monitoring cable from Bcal wedge to patch panel. Consider electronics needed for pulsing system (Elton and Fernando) | # Decide on cable connections for monitoring cable from Bcal wedge to patch panel. Consider electronics needed for pulsing system (Elton and Fernando) | ||
− | # Clarify option of purchase of additional SiPMs (Elton) | + | # <strike> Clarify option of purchase of additional SiPMs (Elton) </strike> |
− | # Send optional values for 86KOHm resistor to Chris to investigate delivery times (Jack and Chris) | + | # <strike> Send optional values for 86KOHm resistor to Chris to investigate delivery times (Jack and Chris) </strike> |
− | # Order micro Dsub connectors to make connections to the monitoring control board (Chris) | + | # <strike> Order micro Dsub connectors to make connections to the monitoring control board (Chris) </strike> Options in progress: a) purchase crimp tool for local assembly of cables, b) order specialized cables c) purchase premade cables with limited lengths. |
== Tentative Agenda == | == Tentative Agenda == | ||
Line 20: | Line 20: | ||
== Minutes == | == Minutes == | ||
− | ''Attending: | + | ''Attending: Elton, Jack, Fernando, Nick, Jim, Yi |
+ | |||
+ | # Announcements | ||
+ | # Action Items | ||
+ | # Schedule, reporting, and manpower (Elton) | ||
+ | # mini-Bcal | ||
+ | #* See [https://cebaf.jlab.org/elog/entry/1798611 Log Entry for LED and cosmic pulses] | ||
+ | # SiPM production testing (Yi) | ||
+ | # Mechanical assembly (Jim) | ||
+ | # Temperature compensation (Jack) | ||
+ | # Electronic boards (Fernando and Chris) | ||
+ | # Light guide gluing setup |
Revision as of 08:02, 24 August 2012
Action Items from previous meetings
- Decide on cable connections for monitoring cable from Bcal wedge to patch panel. Consider electronics needed for pulsing system (Elton and Fernando)
-
Clarify option of purchase of additional SiPMs (Elton) -
Send optional values for 86KOHm resistor to Chris to investigate delivery times (Jack and Chris) -
Order micro Dsub connectors to make connections to the monitoring control board (Chris)Options in progress: a) purchase crimp tool for local assembly of cables, b) order specialized cables c) purchase premade cables with limited lengths.
Tentative Agenda
- Announcements
- Action Items
- Schedule, reporting, and manpower (Elton)
- mini-Bcal
- SiPM production testing (Yi)
- Mechanical assembly (Jim)
- Temperature compensation (Jack)
- Electronic boards (Fernando and Chris)
- Light guide gluing setup
Minutes
Attending: Elton, Jack, Fernando, Nick, Jim, Yi
- Announcements
- Action Items
- Schedule, reporting, and manpower (Elton)
- mini-Bcal
- SiPM production testing (Yi)
- Mechanical assembly (Jim)
- Temperature compensation (Jack)
- Electronic boards (Fernando and Chris)
- Light guide gluing setup