Difference between revisions of "Aug 23, 2011 SiPM Electrical and Cooling"

From GlueXWiki
Jump to: navigation, search
(Tentative Agenda)
Line 2: Line 2:
  
 
# Decide on cable connections for monitoring cable from Bcal wedge to patch panel. Consider electronics needed for pulsing system (Elton and Fernando)
 
# Decide on cable connections for monitoring cable from Bcal wedge to patch panel. Consider electronics needed for pulsing system (Elton and Fernando)
# Clarify option of purchase of additional SiPMs (Elton)
+
# <strike> Clarify option of purchase of additional SiPMs (Elton) </strike>
# Send optional values for 86KOHm resistor to Chris to investigate delivery times (Jack and Chris)
+
# <strike> Send optional values for 86KOHm resistor to Chris to investigate delivery times (Jack and Chris) </strike>
# Order micro Dsub connectors to make connections to the monitoring control board (Chris)
+
# <strike> Order micro Dsub connectors to make connections to the monitoring control board (Chris) </strike> Options in progress: a) purchase crimp tool for local assembly of cables, b) order specialized cables c) purchase premade cables with limited lengths.
  
 
== Tentative Agenda ==
 
== Tentative Agenda ==
Line 20: Line 20:
  
 
== Minutes ==
 
== Minutes ==
''Attending:
+
''Attending: Elton, Jack, Fernando, Nick, Jim, Yi
 +
 
 +
# Announcements
 +
# Action Items
 +
# Schedule, reporting, and manpower (Elton)
 +
# mini-Bcal
 +
#* See [https://cebaf.jlab.org/elog/entry/1798611 Log Entry for LED and cosmic pulses]
 +
# SiPM production testing (Yi)
 +
# Mechanical assembly (Jim)
 +
# Temperature compensation (Jack)
 +
# Electronic boards (Fernando and Chris)
 +
# Light guide gluing setup

Revision as of 08:02, 24 August 2012

Action Items from previous meetings

  1. Decide on cable connections for monitoring cable from Bcal wedge to patch panel. Consider electronics needed for pulsing system (Elton and Fernando)
  2. Clarify option of purchase of additional SiPMs (Elton)
  3. Send optional values for 86KOHm resistor to Chris to investigate delivery times (Jack and Chris)
  4. Order micro Dsub connectors to make connections to the monitoring control board (Chris) Options in progress: a) purchase crimp tool for local assembly of cables, b) order specialized cables c) purchase premade cables with limited lengths.

Tentative Agenda

  1. Announcements
  2. Action Items
  3. Schedule, reporting, and manpower (Elton)
  4. mini-Bcal
  5. SiPM production testing (Yi)
  6. Mechanical assembly (Jim)
  7. Temperature compensation (Jack)
  8. Electronic boards (Fernando and Chris)
  9. Light guide gluing setup

Minutes

Attending: Elton, Jack, Fernando, Nick, Jim, Yi

  1. Announcements
  2. Action Items
  3. Schedule, reporting, and manpower (Elton)
  4. mini-Bcal
  5. SiPM production testing (Yi)
  6. Mechanical assembly (Jim)
  7. Temperature compensation (Jack)
  8. Electronic boards (Fernando and Chris)
  9. Light guide gluing setup