Action Items from previous meetings
- Decide on cable connections for monitoring cable from Bcal wedge to patch panel. Consider electronics needed for pulsing system (Elton and Fernando)
-
Clarify option of purchase of additional SiPMs (Elton) -
Send optional values for 86KOHm resistor to Chris to investigate delivery times (Jack and Chris) -
Order micro Dsub connectors to make connections to the monitoring control board (Chris)Options in progress: a) purchase crimp tool for local assembly of cables, b) order specialized cables c) purchase premade cables with limited lengths.
Tentative Agenda
- Announcements
- Action Items
- Schedule, reporting, and manpower (Elton)
- mini-Bcal
- SiPM production testing (Yi)
- Mechanical assembly (Jim)
- Temperature compensation (Jack)
- Electronic boards (Fernando and Chris)
- Light guide gluing setup
Minutes
Attending: Elton, Jack, Fernando, Nick, Jim, Yi
- Announcements
- Action Items
- Schedule, reporting, and manpower (Elton)
- mini-Bcal
- SiPM production testing (Yi)
- Mechanical assembly (Jim)
- Temperature compensation (Jack)
- Electronic boards (Fernando and Chris)
- Light guide gluing setup