''Attendees:Elton, Jon, Mark, Adesh (JLab); Ahmed, Zisis, Colleen (UofR); Will, Curtis (CMU); Sean (NW); Matt (IU); George (Athens).
 
''Attendees:Elton, Jon, Mark, Adesh (JLab); Ahmed, Zisis, Colleen (UofR); Will, Curtis (CMU); Sean (NW); Matt (IU); George (Athens).
 
  
 
# Announcements
 
# Announcements
 +
## Zisis: UofR has been supporting UConn to characterize the diamond radiators at the Canadian light source. Tegan and Andrei are helping now. The lab has provided great support. Future runs would benefit from adding a 2nd stage preparation of the beam to streamline measurements.
 +
## Elton: The Compton Calorimeter CompCal is in being installed behind the Fcal. The support is located  between back of the Fcal dark room and the first row of racks. The CompCal will be an array of Pb glass (~5x5) on a platform on one side of the beam to test feasibility of measuring the Compton signal coming through the beam hole. The plan is to install and connect the detector to electronics for the fall run.
 
# Action Items
 
# Action Items
# Preparation for REST production
+
# Preparation for fall run
 +
## Fcal and Bcal will turn on after f250 electronics is tested and loaded with latest firmware
 +
## Zisis: Assume Bcal will run at 1.4 V overbuys and T=5 deg C, as we did in the spring.
 +
## Elton: The LED monitoring program by Ahmed should be readied for the run. Ahmed: LED pulsing system was checked for the spring run and found about 5% channels misbehaving. Most problems were for up/down channels during the low bias settings. This is likely an issue with the monitoring system or software, since at high bias the response was as expected. Ahmed is preparing a plugin to use the monitoring system to check the system response.
 
# FCAL update
 
# FCAL update
 
# BCAL update
 
# BCAL update
 +
## Michel Electrons (Zisis for Colleen)
 +
##* Colleen is finalizing a report
 +
##*
 
## [https://logbooks.jlab.org/files/2016/08/3418731/shower_lvl_corrs_condensed_0.pdf BCAL non-linear energy corrections] (Will M.)
 
## [https://logbooks.jlab.org/files/2016/08/3418731/shower_lvl_corrs_condensed_0.pdf BCAL non-linear energy corrections] (Will M.)
 
## [https://logbooks.jlab.org/files/2016/08/3418091/quick_look_at_6GeV_pi0_merging.pdf High energy shower merging] (Will M.)
 
## [https://logbooks.jlab.org/files/2016/08/3418091/quick_look_at_6GeV_pi0_merging.pdf High energy shower merging] (Will M.)

Revision as of 15:04, 25 August 2016

Video Conferencing Information

Meeting Time: 12:15 p.m.

  1. To join via a Web Browser, go to the page [1] https://bluejeans.com/907185247.
  2. To join via Polycom room system go to the IP Address: 199.48.152.152 (bjn.vc) and enter the meeting ID: 907185247.
  3. To join via phone, use one of the following numbers and the Conference ID: 907185247.
    • US or Canada: +1 408 740 7256 or
    • US or Canada: +1 888 240 2560
  4. Upon connection all microphones are automatically muted. To unmute your mike on a Polycom or equivalent unit, enter *4. Unmuting on a computer is trivial as there is a microphone button than can be clicked.
  5. More information on connecting to bluejeans is available.

Participant Direct Lines

  • JLab Phone: in CC F326 is 757-269-6460 (usual room)
  • JLab Phone in CC L207 is 757-269-7084
  • Phone in the Regina Video-conference Suite is 306-585-4204
  • Athens Phone: in Christina's office is 011-30-210-727-6947

Action Items

  • Produce documentation for implementation of timing algorithms and constants (Andrei)

References

  1. FCAL HDFCAL log book
  2. BCAL HDBCAL log book
  3. BCAL Action Items and Working Tasks

Tentative Agenda

  1. Announcements
  2. Action Items
  3. Preparation for REST production
  4. FCAL update
  5. BCAL update
    1. BCAL non-linear energy corrections (Will M.)
    2. High energy shower merging (Will M.)
  6. Calibrations
  7. Reconstruction and Simulation
  8. Any other business

Minutes

Attendees:Elton, Jon, Mark, Adesh (JLab); Ahmed, Zisis, Colleen (UofR); Will, Curtis (CMU); Sean (NW); Matt (IU); George (Athens).

  1. Announcements
    1. Zisis: UofR has been supporting UConn to characterize the diamond radiators at the Canadian light source. Tegan and Andrei are helping now. The lab has provided great support. Future runs would benefit from adding a 2nd stage preparation of the beam to streamline measurements.
    2. Elton: The Compton Calorimeter CompCal is in being installed behind the Fcal. The support is located between back of the Fcal dark room and the first row of racks. The CompCal will be an array of Pb glass (~5x5) on a platform on one side of the beam to test feasibility of measuring the Compton signal coming through the beam hole. The plan is to install and connect the detector to electronics for the fall run.
  2. Action Items
  3. Preparation for fall run
    1. Fcal and Bcal will turn on after f250 electronics is tested and loaded with latest firmware
    2. Zisis: Assume Bcal will run at 1.4 V overbuys and T=5 deg C, as we did in the spring.
    3. Elton: The LED monitoring program by Ahmed should be readied for the run. Ahmed: LED pulsing system was checked for the spring run and found about 5% channels misbehaving. Most problems were for up/down channels during the low bias settings. This is likely an issue with the monitoring system or software, since at high bias the response was as expected. Ahmed is preparing a plugin to use the monitoring system to check the system response.
  4. FCAL update
  5. BCAL update
    1. Michel Electrons (Zisis for Colleen)
      • Colleen is finalizing a report
    2. BCAL non-linear energy corrections (Will M.)
    3. High energy shower merging (Will M.)
  6. Calibrations
  7. Reconstruction and Simulation
  8. Any other business