Aug 27, 2009 Readout

From GlueXWiki
Revision as of 10:33, 27 August 2009 by Zorn (Talk | contribs)

Jump to: navigation, search

Teleconference Time: 11:00 a.m. EST

  • ESNET and EVO session
  • Phone:
    • +1-800-377-8846 : US
    • +1-888-276-7715 : Canada
    • +1-302-709-8424 : International
    • then enter participant code: 77438230# (remember the "#"). Note participant code changed 7/2/09.

Items for followup from previous meeting

  1. Ship Baby Bcal to USM (Will to provide payment information to Zisis)
  2. Make progress on USM MOU document (Elton, Will, Eugene)
  3. Optimization of Bfield direction and magnitude relative to pmt
  4. Light collection efficiencies for light guides for "USM" geometry.

Documents to Review

Tentative Agenda

  1. Announcements
  2. Review of Action Items
  3. USM report
  4. [Bcal Readout Review (July 21) Recommendations
    1. Develop a comprehensive test plan for the expected 10 units of SIPM assemblies from Hamamatsu and SensL, including the testing of long term stability and reliability, and operation at close to realistic (radiation) conditions.
    2. Make the choice of photo-sensor system for the BCAL and place an order only after obtaining and analyzing the results of the above tests. The Committee is aware that this could cause a few months delay of the fabrication/installation schedule, but considers the tests and analyses to be of higher value.
  5. Plan for SiPM Testing (Carl)
  6. Simulations
  7. Discussions on MOU with USM

Minutes

Attending: