− | ''Attendees: | + | ''Attendees: Alam, Elton, Beni (JLab); Will, Hayk, Serguei (USM); Shawn (UofR); Matt (IU); George (Athens). |
+ | |||
+ | # Announcements | ||
+ | # Action Items | ||
+ | # Monitoring | ||
+ | # FCAL | ||
+ | ## Contract completion | ||
+ | ##* All purchases for contract completed | ||
+ | ##* Remaining materials prepared at IU for dark box have been shipped and probably received at JLab last week | ||
+ | ##* Finishing construction of the labyrinth | ||
+ | ##* Closeout of contract expected for the end of August. Elton will contact Matt when August bill is submitted to verify contract completion. | ||
+ | ##* Interlock system completed, but programing awaiting interfacing with David Butler. | ||
+ | ## Next project | ||
+ | ##* Local setup of beam test prototype at IU with functional DAQ and Flash-250 readout | ||
+ | ##* Study energy deposition from cosmics. Interest for triggering and pion polarizability experiment | ||
+ | ## HDList tasks list for Fcal. | ||
+ | ##* We will be required to start task lists using [http://devweb.acc.jlab.org/CSUEApps/hdlist/atlis.php HDList] for the Fcal (and all other collaboration installed detectors). | ||
+ | # BCAL | ||
+ | ## Installation | ||
+ | ##* See Photos in [http://gluex.phys.uregina.ca/photos GlueX Photo Archive] | ||
+ | # Reconstruction and Simulation | ||
+ | # TDR update | ||
+ | # Calibration of Calorimeters | ||
+ | # Any other business |
Revision as of 13:20, 27 August 2013
'Teleconference Time: 11:00 a.m. EST
- ESNET (Number is 8542553) and EVO session (GlueX Calorimetry meeting room)
- Phone connection only upon request.
- +1-866-740-1260 : US+Canada
- +1-303-248-0285 : International
- then enter participant code: 3421244# (remember the "#").
- or www.readytalk.com (and code without the #)
Contents
Participant Direct Lines
- JLab Phone: in CC F326 is 757-269-6460 (usual room)
- JLab Phone in CC L207 is 757-269-7084
- Phone in the Regina Videoconference Suite is 306-585-4204
- Athens Phone: in Christina's office is 011-30-210-727-6947
Items for followup from previous meeting(s)
-
FCAL plexiglass pane drawings upload (Elton)GlueX-doc-2280 RevA - Revisit raw data format for Flash-250 MHz following Flash-125 MHz discussion. (all)
Tentative Agenda
- Announcements
- Action Items
- Monitoring
- FCAL
- BCAL
- Installation
- See Photos in GlueX Photo Archive
- Installation
- Reconstruction and Simulation
- TDR update
- Calibration of Calorimeters
- Any other business
Minutes
Attendees: Alam, Elton, Beni (JLab); Will, Hayk, Serguei (USM); Shawn (UofR); Matt (IU); George (Athens).
- Announcements
- Action Items
- Monitoring
- FCAL
- Contract completion
- All purchases for contract completed
- Remaining materials prepared at IU for dark box have been shipped and probably received at JLab last week
- Finishing construction of the labyrinth
- Closeout of contract expected for the end of August. Elton will contact Matt when August bill is submitted to verify contract completion.
- Interlock system completed, but programing awaiting interfacing with David Butler.
- Next project
- Local setup of beam test prototype at IU with functional DAQ and Flash-250 readout
- Study energy deposition from cosmics. Interest for triggering and pion polarizability experiment
- HDList tasks list for Fcal.
- We will be required to start task lists using HDList for the Fcal (and all other collaboration installed detectors).
- Contract completion
- BCAL
- Installation
- See Photos in GlueX Photo Archive
- Installation
- Reconstruction and Simulation
- TDR update
- Calibration of Calorimeters
- Any other business