(Minutes)
Line 43: Line 43:
 
=Minutes=
 
=Minutes=
  
''Attendees:
+
''Attendees: Elton, John, tim, Yi, Dan, Manuel, Beni (Jlab); Christina (Athens); Will, Alam, Javiera, Orlando (USM); Matt (IU); Zisis, Andrei (UofR);
  
 
# Announcements
 
# Announcements
Line 49: Line 49:
 
# Monitoring
 
# Monitoring
 
#* For reference, documents by Tara [http://argus.phys.uregina.ca/cgi-bin/private/DocDB/ShowDocument?docid=2045 GlueX-doc-2045] and  Tegan [http://argus.phys.uregina.ca/cgi-bin/private/DocDB/ShowDocument?docid=2044 GlueX-doc-2044]  been loaded to DocDb  
 
#* For reference, documents by Tara [http://argus.phys.uregina.ca/cgi-bin/private/DocDB/ShowDocument?docid=2045 GlueX-doc-2045] and  Tegan [http://argus.phys.uregina.ca/cgi-bin/private/DocDB/ShowDocument?docid=2044 GlueX-doc-2044]  been loaded to DocDb  
 +
#* Bcal LED boards are being stuffed. The programing has been completed and assembly has started. Expect to complete this week. All 4000 boards should be at the university next week to start testing.
 +
#* Testing capacity is not been determined, but the first shipment of boards will be made with boards passing established criteria. [Boards failing the tests will be set aside for rework at a later date].
 +
#* The flexiboards have arrived, so the LED boards can be tested on their corresponding string.
 +
#* Boards will be labeled with permanent ink, as well as the flexi-board
 +
#* The LED amplitude, width and perhaps jitter will be measured using the induced current in a Hamamatsu photodiode with a voltmeter.
 +
#* String of 10 LEDs will be assembled trying to match LED outputs.
 +
#* Zisis: record keeping? The results will be stored in xcel spread sheets.
 
# FCAL
 
# FCAL
## Construction Status
+
## Electronics / bases
 +
##* An inventory of bases shows that 250 mult boards and 100 sock boards need to be replaced by company after rework
 +
##* Company has been contacted to request an updated schedule.
 +
##* Paul has built a complete control chassis, which functions well and looks great. Part for all chassis are in hand. Remaining chassis will be assembled.
 +
##* Bundling of cables has started following approvals by Fernando
 +
## Frame
 +
##* Fitting step plates continues successfully
 +
##* Design for dark room and enclosure is ongoing
 +
##* Simulation for impact of beam support out of square steel tubing shows that it is somewhat better than air.
 +
##* Design of the tube
 
# BCAL
 
# BCAL
 
## Activities at JLab
 
## Activities at JLab

Revision as of 13:42, 28 August 2012

Teleconference Time: 11:00 a.m. EST

  • ESNET (Number is 8542553) and EVO session (GlueX Calorimetry meeting room)
  • Phone connection only upon request.
    • +1-866-740-1260 : US+Canada
    • +1-303-248-0285 : International
    • then enter participant code: 3421244# (remember the "#").
    • or www.readytalk.com (and code without the #)

Participant Direct Lines

  • JLab Phone: in CC F326 is 757-269-6337 (usual room)
  • JLab Phone in CC L207 is 757-269-7084
  • Phone in the Regina Videoconference Suite is 306-585-4204
  • Athens Phone: in Christina's office is 011-30-210-727-6947


Items for followup from previous meeting(s)

  1. Send table of light guide measurements for Elton and Tim to review for acceptability (Iñaki)
  2. Check on Fcal monitoring board review (Elton and Fernando) Fernando has reviewed the drawings and has approved them.
  3. Update plexiglass sheet drawings and send it to IU and Athens for comments (Elton and Tim) Sketches were found and pass on to IU (John Frye) to develop a design

Tentative Agenda

  1. Announcements
  2. Review of Action Items
  3. Monitoring
  4. FCAL
    1. Construction Status
  5. BCAL
    1. Activities at JLab
    2. Work at Regina
  6. USM update
    1. SiPM Update (Javiera)
  7. TDR update
    1. Instructions for the TDR (You must be logged into the wiki to access this page).
    2. See Feb 14, 2012 Calorimetry Meeting
  8. Calibration of Calorimeters
  9. Simulations/Reconstruction
  10. Any other business

Minutes

Attendees: Elton, John, tim, Yi, Dan, Manuel, Beni (Jlab); Christina (Athens); Will, Alam, Javiera, Orlando (USM); Matt (IU); Zisis, Andrei (UofR);

  1. Announcements
  2. Review of Action Items
  3. Monitoring
    • For reference, documents by Tara GlueX-doc-2045 and Tegan GlueX-doc-2044 been loaded to DocDb
    • Bcal LED boards are being stuffed. The programing has been completed and assembly has started. Expect to complete this week. All 4000 boards should be at the university next week to start testing.
    • Testing capacity is not been determined, but the first shipment of boards will be made with boards passing established criteria. [Boards failing the tests will be set aside for rework at a later date].
    • The flexiboards have arrived, so the LED boards can be tested on their corresponding string.
    • Boards will be labeled with permanent ink, as well as the flexi-board
    • The LED amplitude, width and perhaps jitter will be measured using the induced current in a Hamamatsu photodiode with a voltmeter.
    • String of 10 LEDs will be assembled trying to match LED outputs.
    • Zisis: record keeping? The results will be stored in xcel spread sheets.
  4. FCAL
    1. Electronics / bases
      • An inventory of bases shows that 250 mult boards and 100 sock boards need to be replaced by company after rework
      • Company has been contacted to request an updated schedule.
      • Paul has built a complete control chassis, which functions well and looks great. Part for all chassis are in hand. Remaining chassis will be assembled.
      • Bundling of cables has started following approvals by Fernando
    2. Frame
      • Fitting step plates continues successfully
      • Design for dark room and enclosure is ongoing
      • Simulation for impact of beam support out of square steel tubing shows that it is somewhat better than air.
      • Design of the tube
  5. BCAL
    1. Activities at JLab
    2. Work at Regina
  6. USM update
    1. SiPM Update (Javiera)
  7. TDR update
    1. Instructions for the TDR (You must be logged into the wiki to access this page).
    2. See Feb 14, 2012 Calorimetry Meeting
  8. Calibration of Calorimeters
  9. Simulations/Reconstruction
  10. Any other business