# Get the dosage from the radiation badges on the mini-Bcal during the beam test (Yi) | # Get the dosage from the radiation badges on the mini-Bcal during the beam test (Yi) | ||
# Check that the resistor sets on the pre-production boards meet our specifications so that they can be frozen (Jack) | # Check that the resistor sets on the pre-production boards meet our specifications so that they can be frozen (Jack) | ||
+ | # Sort out missing SiPMs in Jack's list (10 sensors) (Jack and Yi) | ||
== Tentative Agenda == | == Tentative Agenda == |
Revision as of 08:18, 24 August 2012
Action Items from previous meetings
- Decide on cable connections for monitoring cable from Bcal wedge to patch panel. Consider electronics needed for pulsing system (Elton and Fernando)
- Get the dosage from the radiation badges on the mini-Bcal during the beam test (Yi)
- Check that the resistor sets on the pre-production boards meet our specifications so that they can be frozen (Jack)
- Sort out missing SiPMs in Jack's list (10 sensors) (Jack and Yi)
Tentative Agenda
- Announcements
- Action Items
- Schedule, reporting, and manpower (Elton)
- mini-Bcal (Elton)
- SiPM production testing (Yi)
- Mechanical assembly (Jim)
- Temperature compensation (Jack)
- Electronic boards (Fernando and Chris)
- Light guide gluing setup (Scot)