Difference between revisions of "Aug 30, 2011 SiPM Electrical and Cooling"
From GlueXWiki
(→Action Items from previous meetings) |
|||
Line 3: | Line 3: | ||
# Decide on cable connections for monitoring cable from Bcal wedge to patch panel. Consider electronics needed for pulsing system (Elton and Fernando) | # Decide on cable connections for monitoring cable from Bcal wedge to patch panel. Consider electronics needed for pulsing system (Elton and Fernando) | ||
# Get the dosage from the radiation badges on the mini-Bcal during the beam test (Yi) | # Get the dosage from the radiation badges on the mini-Bcal during the beam test (Yi) | ||
− | # Check that the resistor sets on the pre-production boards meet our specifications so that they can be frozen (Jack) | + | # <strike> Check that the resistor sets on the pre-production boards meet our specifications so that they can be frozen (Jack) </strike> |
− | # Sort out missing SiPMs in Jack's list (10 sensors) (Jack and Yi) | + | # <strike> Sort out missing SiPMs in Jack's list (10 sensors) (Jack and Yi) </strike> |
== Tentative Agenda == | == Tentative Agenda == |
Revision as of 17:15, 30 August 2012
Action Items from previous meetings
- Decide on cable connections for monitoring cable from Bcal wedge to patch panel. Consider electronics needed for pulsing system (Elton and Fernando)
- Get the dosage from the radiation badges on the mini-Bcal during the beam test (Yi)
-
Check that the resistor sets on the pre-production boards meet our specifications so that they can be frozen (Jack) -
Sort out missing SiPMs in Jack's list (10 sensors) (Jack and Yi)
Tentative Agenda
- Announcements
- Action Items
- Schedule, reporting, and manpower (Elton)
- mini-Bcal (Elton)
- SiPM production testing (Yi)
- Mechanical assembly (Jim)
- Temperature compensation (Jack)
- Electronic boards (Fernando and Chris)
- Light guide gluing setup (Scot)
Minutes
Attending: