Difference between revisions of "Aug 30, 2011 SiPM Electrical and Cooling"

From GlueXWiki
Jump to: navigation, search
Line 19: Line 19:
  
 
== Minutes ==
 
== Minutes ==
''Attending:
+
''Attending: Elton, Ivan, Scot, Chris, Jim, Jack, Yi
 +
 
 +
# Announcements
 +
# Action Items
 +
# Schedule, reporting, and manpower (Elton)
 +
# mini-Bcal (Elton)
 +
# SiPM production testing (Yi)
 +
# Mechanical assembly (Jim)
 +
# Temperature compensation (Jack)
 +
# Electronic boards (Fernando and Chris)
 +
# Light guide gluing setup (Scot)

Revision as of 17:16, 30 August 2012

Action Items from previous meetings

  1. Decide on cable connections for monitoring cable from Bcal wedge to patch panel. Consider electronics needed for pulsing system (Elton and Fernando)
  2. Get the dosage from the radiation badges on the mini-Bcal during the beam test (Yi)
  3. Check that the resistor sets on the pre-production boards meet our specifications so that they can be frozen (Jack)
  4. Sort out missing SiPMs in Jack's list (10 sensors) (Jack and Yi)

Tentative Agenda

  1. Announcements
  2. Action Items
  3. Schedule, reporting, and manpower (Elton)
  4. mini-Bcal (Elton)
  5. SiPM production testing (Yi)
  6. Mechanical assembly (Jim)
  7. Temperature compensation (Jack)
  8. Electronic boards (Fernando and Chris)
  9. Light guide gluing setup (Scot)

Minutes

Attending: Elton, Ivan, Scot, Chris, Jim, Jack, Yi

  1. Announcements
  2. Action Items
  3. Schedule, reporting, and manpower (Elton)
  4. mini-Bcal (Elton)
  5. SiPM production testing (Yi)
  6. Mechanical assembly (Jim)
  7. Temperature compensation (Jack)
  8. Electronic boards (Fernando and Chris)
  9. Light guide gluing setup (Scot)