Aug 30, 2011 SiPM Electrical and Cooling

From GlueXWiki
Revision as of 08:18, 24 August 2012 by Elton (Talk | contribs) (Action Items from previous meetings)

Jump to: navigation, search

Action Items from previous meetings

  1. Decide on cable connections for monitoring cable from Bcal wedge to patch panel. Consider electronics needed for pulsing system (Elton and Fernando)
  2. Get the dosage from the radiation badges on the mini-Bcal during the beam test (Yi)
  3. Check that the resistor sets on the pre-production boards meet our specifications so that they can be frozen (Jack)
  4. Sort out missing SiPMs in Jack's list (10 sensors) (Jack and Yi)

Tentative Agenda

  1. Announcements
  2. Action Items
  3. Schedule, reporting, and manpower (Elton)
  4. mini-Bcal (Elton)
  5. SiPM production testing (Yi)
  6. Mechanical assembly (Jim)
  7. Temperature compensation (Jack)
  8. Electronic boards (Fernando and Chris)
  9. Light guide gluing setup (Scot)

Minutes

Attending: