Difference between revisions of "Aug 6, 2009 Calorimetry"

From GlueXWiki
Jump to: navigation, search
(Items for followup from previous meeting(s))
(Minutes)
Line 35: Line 35:
 
=Minutes=
 
=Minutes=
  
Attendees:
+
Attendees:  
 +
 
 +
# Announcements
 +
#* None
 +
# Review of Action Items
 +
#* First to items addressed. Dedicated calibration and monitoring meeting will be scheduled.
 +
# FCAL Update
 +
## CAN-ethernet bridge is working well. Test for use with slow controls by Claire was successful. Will be documented
 +
## Contract
 +
### PR for production of Fcal modules has been submitted and signed.
 +
### Detailed cost response needs to be prepared. (Elton to send Regina docs to Matt for reference).
 +
## FEU-84-3 pmt specs
 +
### Matt will meet with Sergey Denisov next week. Needs to get the following information to enable the procurement to go forward:
 +
###* contact info (person as well as e-mail/address/etc)
 +
###* estimated cost
 +
###* updates to specs as suggested by Sergey. Add "not-used" to specification.
 +
## Cosmic-ray test setup -constant progress. Hope to have something to show at collaboration meeting
 +
## Radiation damage tests (Ryan)
 +
### Irradiated glass blocks at cyclotron.
 +
### Brad (student) measuring transmission of irradiated glass
 +
### Transmission vs wavelength for various doses has been completed.
 +
### Still need to understand how to convert of registered dose to units such as Gray.
 +
## Magnetic shields (Tim)
 +
### 14 mil shield has been modified to fit inside shield -> send back to Amuneal to anneal shield and ship back
 +
### Expect receipt of annealed shield in two weeks to verify final configuration.
 +
###* How much (if any testing) can be done before shipping pmts? Should one plan to purchase more than needed and make a selection here? What fraction of rejects are expected?
 +
# BCAL Updates
 +
## Fabrication (Zisis)
 +
### Press Frame
 +
### Swager/Lead
 +
### Fibre Sorting Table
 +
### Construction Methods
 +
## Fibre QA (Zisis)
 +
##* Shipment03 Preliminary JPG [[Media:Shipment03_Preliminary.jpg]]
 +
##* Shipment03 Preliminary PDF [[Media:Shipment03_Preliminary.pdf]]
 +
# Simulations
 +
# BCAL Readout
 +
# Other business

Revision as of 13:32, 6 August 2009

Teleconference Time: 11:00 a.m. EST

  • ESNET and EVO session
  • Phone:
    • +1-800-377-8846 : US
    • +1-888-276-7715 : Canada
    • +1-302-709-8424 : International
    • then enter participant code: 77438230# (remember the "#"). Note: code changed 7/2/09

Items for followup from previous meeting(s)

  1. Procedure to avoid vaseline in Bcal fabrication needs to be approved.
  2. Documentation on fiber first-article
  3. Review calibration procedures

Documents to Review

Tentative Agenda

  1. Announcements
  2. Review of Action Items
  3. FCAL Update
  4. BCAL Updates
    1. Fabrication (Zisis)
      1. Press Frame
      2. Swager/Lead
      3. Fibre Sorting Table
      4. Construction Methods
    2. Fibre QA (Zisis)
  5. Simulations
  6. BCAL Readout
  7. Other business

Minutes

Attendees:

  1. Announcements
    • None
  2. Review of Action Items
    • First to items addressed. Dedicated calibration and monitoring meeting will be scheduled.
  3. FCAL Update
    1. CAN-ethernet bridge is working well. Test for use with slow controls by Claire was successful. Will be documented
    2. Contract
      1. PR for production of Fcal modules has been submitted and signed.
      2. Detailed cost response needs to be prepared. (Elton to send Regina docs to Matt for reference).
    3. FEU-84-3 pmt specs
      1. Matt will meet with Sergey Denisov next week. Needs to get the following information to enable the procurement to go forward:
        • contact info (person as well as e-mail/address/etc)
        • estimated cost
        • updates to specs as suggested by Sergey. Add "not-used" to specification.
    4. Cosmic-ray test setup -constant progress. Hope to have something to show at collaboration meeting
    5. Radiation damage tests (Ryan)
      1. Irradiated glass blocks at cyclotron.
      2. Brad (student) measuring transmission of irradiated glass
      3. Transmission vs wavelength for various doses has been completed.
      4. Still need to understand how to convert of registered dose to units such as Gray.
    6. Magnetic shields (Tim)
      1. 14 mil shield has been modified to fit inside shield -> send back to Amuneal to anneal shield and ship back
      2. Expect receipt of annealed shield in two weeks to verify final configuration.
        • How much (if any testing) can be done before shipping pmts? Should one plan to purchase more than needed and make a selection here? What fraction of rejects are expected?
  4. BCAL Updates
    1. Fabrication (Zisis)
      1. Press Frame
      2. Swager/Lead
      3. Fibre Sorting Table
      4. Construction Methods
    2. Fibre QA (Zisis)
  5. Simulations
  6. BCAL Readout
  7. Other business