Difference between revisions of "August 1, 2017 DIRC"

From GlueXWiki
Jump to: navigation, search
(Agenda)
(Agenda)
 
(3 intermediate revisions by 2 users not shown)
Line 17: Line 17:
  
 
# Announcements
 
# Announcements
# Support structure update (John/Matt)
+
# Support structure update (John/Matt): Images [https://halldweb.jlab.org/wiki/images/e/e7/IMG_2262.jpg 1] [https://halldweb.jlab.org/wiki/images/6/6e/IMG_2263.jpg 2]
 
# Optical box
 
# Optical box
 
#* Design and PMT mounting update (Jason)
 
#* Design and PMT mounting update (Jason)
Line 24: Line 24:
 
#* Electronics (Fernando)
 
#* Electronics (Fernando)
 
# Bar box transportation and monitoring
 
# Bar box transportation and monitoring
#* Monitoring logistics ([https://halldweb.jlab.org/wiki/index.php/File:MonitoringUpdate_0801_Yang.pdf'''John and Yunjie'''])
+
#* [https://halldweb.jlab.org/wiki/images/0/0c/MonitoringUpdate_0801_Yang.pdf'''Monitoring logistics'''] (John and Yunjie)
 
#* Camera monitoring system (Greg)
 
#* Camera monitoring system (Greg)
 
#* Dry run at IU (All)
 
#* Dry run at IU (All)
 
# AOB
 
# AOB

Latest revision as of 13:41, 1 August 2017

Meeting Information

GlueX DIRC Meeting
Tuesday August 1, 2017
1:00 pm, EDT
JLab room A110

Connection Using Bluejeans

  1. To join via Polycom room system go to the IP Address: 199.48.152.152 (bjn.vc) and enter the meeting ID: 846453895.
  2. To join via a Web Browser, go to the page [1] https://bluejeans.com/846453895 .
  3. To join via phone, use one of the following numbers and the Conference ID: 846453895
    • US or Canada: +1 408 740 7256 or
    • US or Canada: +1 888 240 2560
  4. More information on connecting to bluejeans is available.

Agenda

  1. Announcements
  2. Support structure update (John/Matt): Images 1 2
  3. Optical box
    • Design and PMT mounting update (Jason)
    • Calibration studies (Ahmed)
    • Simulation studies (Maria and Roman)
    • Electronics (Fernando)
  4. Bar box transportation and monitoring
  5. AOB