* Discussed overall geometry and decided 40x40 crystal plus 19 lead glass block layers surrounding the crystals covered a wide enough area. The attached layout shows the trajectory of the particles grazing the BCAL [[Media:Particle trajectory through BCAL.pdf]]
 +
 
 +
== Action items ==
 
* We will go with the 40x40 matrix for the design, we will have to shim if the install changes to 32x32
 
* We will go with the 40x40 matrix for the design, we will have to shim if the install changes to 32x32
 
* Need to define rohacell
 
* Need to define rohacell

Revision as of 14:13, 19 August 2019

Meeting Time and Place

Thursday August 15 3pm At Jefferson Lab, room TED 2504

Agenda

Minutes

  • Discussed overall geometry and decided 40x40 crystal plus 19 lead glass block layers surrounding the crystals covered a wide enough area. The attached layout shows the trajectory of the particles grazing the BCAL Media:Particle trajectory through BCAL.pdf

Action items

  • We will go with the 40x40 matrix for the design, we will have to shim if the install changes to 32x32
  • Need to define rohacell
  • Need to define monitoring system
  • Need to define tungsten absorber geometry
  • Need to perform heat load calcs
  • Need to define cable management system
  • Need to define shim material