Difference between revisions of "August 2, 2018 DIRC Optical Box"

From GlueXWiki
Jump to: navigation, search
(Created page with "== Meeting Information == GlueX DIRC Optical Box Meeting<br> Thursday August 2, 2018<br> 10:00 am, EST<br> JLab A110 <br> == Connection Using Bluejeans == # To join via Poly...")
 
(Agenda)
 
Line 32: Line 32:
 
#*** Flow water through full system and establish controls, N2 purge, etc.
 
#*** Flow water through full system and establish controls, N2 purge, etc.
 
# Mirror box laser alignment
 
# Mirror box laser alignment
#* [https://halldweb.jlab.org/DocDB/0035/003581/002/2018_July_19.pdf Update on geometry and laser projections] (Bill)
+
#* [https://halldweb.jlab.org/DocDB/0035/003581/002/2018_Aug_02.pdf Update on geometry and laser projections] (Bill)
 
#* [https://halldweb.jlab.org/doc-private/DocDB/ShowDocument?docid=3521 Optical Box Alignment strawman] (Tim)
 
#* [https://halldweb.jlab.org/doc-private/DocDB/ShowDocument?docid=3521 Optical Box Alignment strawman] (Tim)
 
#* [https://halldweb.jlab.org/doc-private/DocDB/ShowDocument?docid=3578 Laser Alignment fixture] (Tim)
 
#* [https://halldweb.jlab.org/doc-private/DocDB/ShowDocument?docid=3578 Laser Alignment fixture] (Tim)
 
# AOB
 
# AOB

Latest revision as of 09:25, 2 August 2018

Meeting Information

GlueX DIRC Optical Box Meeting
Thursday August 2, 2018
10:00 am, EST
JLab A110

Connection Using Bluejeans

  1. To join via Polycom room system go to the IP Address: 199.48.152.152 (bjn.vc) and enter the meeting ID: 846453895.
  2. To join via a Web Browser, go to the page [1] https://bluejeans.com/846453895 .
  3. To join via phone, use one of the following numbers and the Conference ID: 846453895
    • US or Canada: +1 408 740 7256 or
    • US or Canada: +1 888 240 2560
  4. More information on connecting to bluejeans is available.

Agenda

  1. Announcement
  2. Optical box status
    • Fabrication status update (Ernie and Jason)
      • Packing list for shipment to JLab:
      • Component QA and assembly status at Bates
      • Window frame modification
      • Mirror strong back QA and mirror cutting/assembly
      • Assembly sequence and testing plans at Bates
      • Dark box enclosure development: air flow calculations
  3. Installation schedule discussion:
    • Requirements for mechanical install of optical box: Aug 10 installation schedule
      • Delivery of outer optical box (mirror box not required), window, flange, and gasket by August 10
      • Goals (reduce risk for final installation):
        • Test water tightness of optical box and interface with bar boxes
        • Flow water through full system and establish controls, N2 purge, etc.
  4. Mirror box laser alignment
  5. AOB