#** Mirror box laser alignment [https://halldweb.jlab.org/DocDB/0035/003581/002/2018_Aug_02.pdf geometry and laser projections] (Bill/Stephanie)
 
#** Mirror box laser alignment [https://halldweb.jlab.org/DocDB/0035/003581/002/2018_Aug_02.pdf geometry and laser projections] (Bill/Stephanie)
 
# DAQ integration
 
# DAQ integration
#* Sergey successfully read out SSP with 2 FPGA boards in DIRC crate with production DAQ!
+
#* Sergey successfully read out SSP with 2 FPGA boards in DIRC crate with production DAQ
 
#* David Lawrence is developing EVIO parser based on this data, then a translation table will be developed
 
#* David Lawrence is developing EVIO parser based on this data, then a translation table will be developed
 
# Software/simulations
 
# Software/simulations

Revision as of 15:28, 17 August 2018

Meeting Information

GlueX DIRC Meeting
Monday August 20, 2018
2:00 pm, EDT
JLab room A110

Connection Using Bluejeans

  1. To join via Polycom room system go to the IP Address: 199.48.152.152 (bjn.vc) and enter the meeting ID: 846453895.
  2. To join via a Web Browser, go to the page [1] https://bluejeans.com/846453895 .
  3. To join via phone, use one of the following numbers and the Conference ID: 846453895
    • US or Canada: +1 408 740 7256 or
    • US or Canada: +1 888 240 2560
  4. More information on connecting to bluejeans is available.

Agenda

  1. Announcements
    • New meeting time for Fall semester: Mondays at 1 pm
  2. Optical box
  3. DAQ integration
    • Sergey successfully read out SSP with 2 FPGA boards in DIRC crate with production DAQ
    • David Lawrence is developing EVIO parser based on this data, then a translation table will be developed
  4. Software/simulations
    • Software overview and tasks
    • Finalizing DIRC "as-build" geometry: support frames, etc. (Yunjie)
  5. MAPMT testing
    • Magnetic field test initial results (Bill and Andrew)
  6. Commissioning plans
  7. Reminder: Addressing ERR review recommendations
    • Recommendations pertaining to Fall 2018 DIRC commissioning should be addressed before October installation (required for new beam time request)
  8. AOB