Difference between revisions of "August 20, 2021 DIRC"
From GlueXWiki
(→Agenda) |
(→Agenda) |
||
(One intermediate revision by the same user not shown) | |||
Line 17: | Line 17: | ||
# Announcements | # Announcements | ||
− | # | + | # Hardware work (All) |
#* [https://photos.app.goo.gl/TynJtxspVdT4jjd99 Mirror production progress] and [https://photos.app.goo.gl/vwk41FEjyU5FhyCV7 installation] (Justin) | #* [https://photos.app.goo.gl/TynJtxspVdT4jjd99 Mirror production progress] and [https://photos.app.goo.gl/vwk41FEjyU5FhyCV7 installation] (Justin) | ||
#* [https://logbooks.jlab.org/entry/3892167 Latest inspections of mirror prototypes] (Bill) | #* [https://logbooks.jlab.org/entry/3892167 Latest inspections of mirror prototypes] (Bill) | ||
#* [https://logbooks.jlab.org/entry/3890606 Resealing dark boxes] and pulser tests of LV and temperature [https://logbooks.jlab.org/entry/3891456 20 min][https://logbooks.jlab.org/entry/3891461 40 min] | #* [https://logbooks.jlab.org/entry/3890606 Resealing dark boxes] and pulser tests of LV and temperature [https://logbooks.jlab.org/entry/3891456 20 min][https://logbooks.jlab.org/entry/3891461 40 min] | ||
+ | #* [https://logbooks.jlab.org/entry/3893753 Gap in lower bar box shroud ] | ||
# DIRC commissioning analyses and 2020 studies (All) | # DIRC commissioning analyses and 2020 studies (All) | ||
− | #* [https://halldweb.jlab.org/wiki-private/index.php/Spring_2020_Dataset_Summary#Full_REST_Production Spring 2020 data production status] and [https://halldweb.jlab.org/wiki-private/index.php/Spring_2020_Analysis_Launch Analysis launches] | + | #* [https://halldweb.jlab.org/wiki-private/index.php/Spring_2020_Dataset_Summary#Full_REST_Production Spring and Summer 2020 data production status] and [https://halldweb.jlab.org/wiki-private/index.php/Spring_2020_Analysis_Launch Analysis launches] |
#* Geometric reconstruction update (Roman) | #* Geometric reconstruction update (Roman) | ||
#* Cherenkov PDF (Ahmed) | #* Cherenkov PDF (Ahmed) |
Latest revision as of 10:35, 20 August 2021
Meeting Information
GlueX DIRC Meeting
Friday August 20, 2021
10:00 am, ET
Remote only
Connection Using Bluejeans
- To join via Polycom room system go to the IP Address: 199.48.152.152 (bjn.vc) and enter the meeting ID: 846453895.
- To join via a Web Browser, go to the page [1] https://bluejeans.com/846453895 .
- To join via phone, use one of the following numbers and the Conference ID: 846453895
- US or Canada: +1 408 740 7256 or
- US or Canada: +1 888 240 2560
- More information on connecting to bluejeans is available.
Agenda
- Announcements
- Hardware work (All)
- Mirror production progress and installation (Justin)
- Latest inspections of mirror prototypes (Bill)
- Resealing dark boxes and pulser tests of LV and temperature 20 min40 min
- Gap in lower bar box shroud
- DIRC commissioning analyses and 2020 studies (All)
- Spring and Summer 2020 data production status and Analysis launches
- Geometric reconstruction update (Roman)
- Cherenkov PDF (Ahmed)
- FastDIRC documentation (Yunjie)
- Action items (from previous meetings)
- Add incident angle dependence to mirror reflectivity
- Reducing background contamination in pi/K samples: KinFit Δχ2 between 2pi and 2k reactions, robust sideband subtraction
- AOB