Difference between revisions of "August 26, 2016 PID Upgrade"

From GlueXWiki
Jump to: navigation, search
(Agenda)
 
Line 19: Line 19:
 
#* [[August 30, 2016 RICH Conference Practice Talk]]
 
#* [[August 30, 2016 RICH Conference Practice Talk]]
 
# [[August 15, 2016 DIRC Engineering]]
 
# [[August 15, 2016 DIRC Engineering]]
 +
#* John, Matt, and Tim planning trip to SLAC (October 27) to meet with Jerry and inspect bar boxes
 
# Procurement Planning
 
# Procurement Planning
 +
#* FY16: Optical Boxes, Support Structure, ASIC chips and electronics boards
 +
#* FY17: MAPMTs and Transportation of 1 bar box from SLAC to JLab
 
# AOB
 
# AOB

Latest revision as of 12:55, 26 August 2016

Meeting Information

GlueX PID Upgrade Meeting
Friday, August 15, 2016
1 pm, EDT
JLab room F326

Connection Using Bluejeans

  1. To join via Polycom room system go to the IP Address: 199.48.152.152 (bjn.vc) and enter the meeting ID: 846453895.
  2. To join via a Web Browser, go to the page [1] https://bluejeans.com/846453895 .
  3. To join via phone, use one of the following numbers and the Conference ID: 846453895
    • US or Canada: +1 408 740 7256 or
    • US or Canada: +1 888 240 2560
  4. More information on connecting to bluejeans is available.

Agenda

  1. Announcements
  2. August 15, 2016 DIRC Engineering
    • John, Matt, and Tim planning trip to SLAC (October 27) to meet with Jerry and inspect bar boxes
  3. Procurement Planning
    • FY16: Optical Boxes, Support Structure, ASIC chips and electronics boards
    • FY17: MAPMTs and Transportation of 1 bar box from SLAC to JLab
  4. AOB