Difference between revisions of "August 26, 2021 CPP Design Meeting"

From GlueXWiki
Jump to: navigation, search
(Agenda)
(Agenda)
Line 11: Line 11:
 
** Installation/assy 3D Model and dwgs
 
** Installation/assy 3D Model and dwgs
 
** Stand [[image:cpp_stand.pdf|thumb]]
 
** Stand [[image:cpp_stand.pdf|thumb]]
** Steel [[image:cpp_steel.pdf]]
+
** Steel [[image:cpp_steel.pdf|thumb]]
 
** Fcal platform mods
 
** Fcal platform mods
 
*** Cutouts complete [[image:cpp_cutout.pdf|thumb]]
 
*** Cutouts complete [[image:cpp_cutout.pdf|thumb]]

Revision as of 16:46, 25 August 2021

Meeting Time and Place

Thursday August 26, 2021, 3:00pm Bluejeans https://bluejeans.com/465620466

  • Present - Elton, Dave, Stephanie, Ilya, Rory, Mark S, Beni, Simon, Mark I

Agenda

  • Minutes from last meeting https://halldweb.jlab.org/wiki/index.php/July_15,_2021_CPP_Design_Meeting
  • Testing status - Beni
  • Design/Fab/Procurement status
    • Installation/assy 3D Model and dwgs
    • Stand
      Cpp stand.pdf
    • Steel
      Cpp steel.pdf
    • Fcal platform mods
      • Cutouts complete
        Cpp cutout.pdf
      • Most holes drilled in floor
  • Things to work out
    • Gas system, manifold/bubblers (Beni has some)
    • Complete structural analysis - approved by Tom Renzo - need to release into system
    • Develop Detailed installation plan
    • Develop Design/operational/Maintenance Requirements
    • Modified US vacuum system
    • Solid target installation
    • Installation drawing including Microscope move
    • CPP Detector operations in Hall D OSP
    • Possible use of nitrogen flow for cooling electronics in Faraday cage

Minutes and Action Items