August 27, 2014 Calibration

From GlueXWiki
Revision as of 12:11, 26 August 2014 by Sdobbs (Talk | contribs) (Created page with "__TOC__ GlueX Calibration Meeting<br> Wednesday, August 27, 2014<br> 11:00 am, EDT<br> JLab: CEBAF Center, F326<br> == Connection Using Bluejeans == # To join via Polycom room ...")

(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to: navigation, search

GlueX Calibration Meeting
Wednesday, August 27, 2014
11:00 am, EDT
JLab: CEBAF Center, F326

Connection Using Bluejeans

  1. To join via Polycom room system go to the IP Address: 199.48.152.152 (bjn.vc) and enter the meeting ID: 630804895.
  2. To join via a Web Browser, go to the page [1] https://bluejeans.com/630804895.
  3. To join via phone, use one of the following numbers and the Conference ID: 630804895
    • US or Canada: +1 408 740 7256 or
    • US or Canada: +1 888 240 2560
  4. Upon connection all microphones are automatically muted. To unmute your mike on a Polycom or equivalent unit, enter *4
  5. More information on connecting to bluejeans is available.

Agenda

  1. Announcements
  2. Commissioning Planning
  3. Fall 2014 Commissioning Simulations
    • Status Update
    • Number of Events & Final States
    • EM Background Simulations (Sean)
  4. Action Items
  5. AOT


Action Items

  • Update desired event counts (all)
  • Tag new sim-recon version (Mark I.)
  • Update geometry for commissioning running (Simon)
  • Obtain new constants for EM background simulation & magnetic field (Sean)
  • Update expected photoproduction event rate calculations
  • Decide number of events & conditions to simulate
  • Run simulations
  • What is the lowest solenoid current that we can run at? How will a low solenoid current affect FDC alignment?
  • Study FCAL & BCAL trigger thresholds