Difference between revisions of "August 29, 2017 DIRC"

From GlueXWiki
Jump to: navigation, search
(Agenda)
(Agenda)
Line 20: Line 20:
 
# Optical box
 
# Optical box
 
#* Design and PMT mounting update (Jason)
 
#* Design and PMT mounting update (Jason)
#* Simulation studies (Maria and Roman) ([https://halldweb.jlab.org/wiki/images/a/a1/DIRC_Online_Calibration_Preliminary_Studies-2.pdf Mirror Miscalibration (Cristiano)])
+
#* Simulation studies (Maria and Roman) ([https://halldweb.jlab.org/wiki/images/a/a1/DIRC_Online_Calibration_Preliminary_Studies-2.pdf Mirror calibration (Cristiano)])
 
#* Electronics (Fernando)
 
#* Electronics (Fernando)
 
# Bar box transportation and monitoring
 
# Bar box transportation and monitoring

Revision as of 13:05, 29 August 2017

Meeting Information

GlueX DIRC Meeting
Tuesday August 29, 2017
1:00 pm, EDT
JLab room A110

Connection Using Bluejeans

  1. To join via Polycom room system go to the IP Address: 199.48.152.152 (bjn.vc) and enter the meeting ID: 846453895.
  2. To join via a Web Browser, go to the page [1] https://bluejeans.com/846453895 .
  3. To join via phone, use one of the following numbers and the Conference ID: 846453895
    • US or Canada: +1 408 740 7256 or
    • US or Canada: +1 888 240 2560
  4. More information on connecting to bluejeans is available.

Agenda

  1. Announcements
  2. Support structure update (John)
  3. Optical box
  4. Bar box transportation and monitoring
  5. Water system update (Tim)
  6. Nitrogen system in Hall (Tom)
  7. AOB