Difference between revisions of "August 3, 2020 DIRC"

From GlueXWiki
Jump to: navigation, search
(Created page with "== Meeting Information == GlueX DIRC Meeting<br> Monday August 3, 2020<br> 1:00 pm, EDT<br> '''Remote only''' == Connection Using Bluejeans == # To join via Polycom room sys...")
 
(Agenda)
Line 18: Line 18:
 
# Announcements:
 
# Announcements:
 
# DIRC startup plans for summer run (Bill, Justin, All)
 
# DIRC startup plans for summer run (Bill, Justin, All)
#* Run startup status
+
#* Run startup status: [https://halldweb.jlab.org/data_monitoring/Plot_Browser.html?minRunNum=72590&maxRunNum=72609&RunPeriod=RunPeriod-2019-11&Version=rawdata_ver00&Plot=DIRC_hit&rcdb_query=daq_run%3D%3D%27PHYSICS_DIRC%27%20and%20event_count%20%3E%20500000%20and%20solenoid_current%20%3E%20100%20and%20collimator_diameter%20%21%3D%20%27Blocking%27 initial monitoring plots] look OK.
 +
#* [https://halldweb.jlab.org/work/halld2/data_monitoring/RunPeriod-2019-11/rawdata_ver00/Run072605/DIRC_North_occupancy.png Interesting pattern for North OB LED]
 
#* TRD/GEM options?
 
#* TRD/GEM options?
 
# DIRC commissioning analyses and 2020 studies (All)
 
# DIRC commissioning analyses and 2020 studies (All)
Line 24: Line 25:
 
#** Monitoring launch ver12 completed (10 files from each run): used to check time offsets by run and initial PID studies
 
#** Monitoring launch ver12 completed (10 files from each run): used to check time offsets by run and initial PID studies
 
#*** Files being combined at /volatile/halld/home/jrsteven/RunPeriod-2019-11/offline_monitoring/ver12_pass07/hd_root.root
 
#*** Files being combined at /volatile/halld/home/jrsteven/RunPeriod-2019-11/offline_monitoring/ver12_pass07/hd_root.root
#** Monitoring launch ver16 completed: Hopefully final monitoring launch 71350-71727
+
#** Monitoring launch ver16 completed: Final monitoring launch 71350-71727
 +
#** Production launch testing at NERSC ongoing
 
#* Geometric reconstruction update (Ahmed/Roman)
 
#* Geometric reconstruction update (Ahmed/Roman)
 
#* FastDIRC update (Yunjie)
 
#* FastDIRC update (Yunjie)

Revision as of 12:46, 3 August 2020

Meeting Information

GlueX DIRC Meeting
Monday August 3, 2020
1:00 pm, EDT
Remote only

Connection Using Bluejeans

  1. To join via Polycom room system go to the IP Address: 199.48.152.152 (bjn.vc) and enter the meeting ID: 846453895.
  2. To join via a Web Browser, go to the page [1] https://bluejeans.com/846453895 .
  3. To join via phone, use one of the following numbers and the Conference ID: 846453895
    • US or Canada: +1 408 740 7256 or
    • US or Canada: +1 888 240 2560
  4. More information on connecting to bluejeans is available.

Agenda

  1. Announcements:
  2. DIRC startup plans for summer run (Bill, Justin, All)
  3. DIRC commissioning analyses and 2020 studies (All)
    • Spring 2020 monitoring and data production status (Justin)
      • Monitoring launch ver12 completed (10 files from each run): used to check time offsets by run and initial PID studies
        • Files being combined at /volatile/halld/home/jrsteven/RunPeriod-2019-11/offline_monitoring/ver12_pass07/hd_root.root
      • Monitoring launch ver16 completed: Final monitoring launch 71350-71727
      • Production launch testing at NERSC ongoing
    • Geometric reconstruction update (Ahmed/Roman)
    • FastDIRC update (Yunjie)
  4. Follow-up on additional action items from workfest (All)
    • 100M event MC samples required for ρ and φ data/MC comparisons:
      • /volatile/halld/home/gxproj7/RunPeriod-2019-11/dircsim-2019_11-ver02/analysis/hd_root_gen_2pi_pass00.root
      • /volatile/halld/home/gxproj7/RunPeriod-2019-11/dircsim-2019_11-ver02/analysis/hd_root_gen_2k_pass00.root
  5. AOB