(Created page with "== Meeting Information == GlueX DIRC Meeting<br> Monday August 3, 2020<br> 1:00 pm, EDT<br> '''Remote only''' == Connection Using Bluejeans == # To join via Polycom room sys...") |
(→Agenda) |
||
(2 intermediate revisions by one other user not shown) | |||
Line 18: | Line 18: | ||
# Announcements: | # Announcements: | ||
# DIRC startup plans for summer run (Bill, Justin, All) | # DIRC startup plans for summer run (Bill, Justin, All) | ||
− | #* Run startup status | + | #* Run startup status: [https://halldweb.jlab.org/data_monitoring/Plot_Browser.html?minRunNum=72590&maxRunNum=72609&RunPeriod=RunPeriod-2019-11&Version=rawdata_ver00&Plot=DIRC_hit&rcdb_query=daq_run%3D%3D%27PHYSICS_DIRC%27%20and%20event_count%20%3E%20500000%20and%20solenoid_current%20%3E%20100%20and%20collimator_diameter%20%21%3D%20%27Blocking%27 initial monitoring plots] look OK. |
+ | #* [https://halldweb.jlab.org/work/halld2/data_monitoring/RunPeriod-2019-11/rawdata_ver00/Run072605/DIRC_North_occupancy.png Interesting pattern for North OB LED], water in the diffuser? | ||
#* TRD/GEM options? | #* TRD/GEM options? | ||
# DIRC commissioning analyses and 2020 studies (All) | # DIRC commissioning analyses and 2020 studies (All) | ||
Line 24: | Line 25: | ||
#** Monitoring launch ver12 completed (10 files from each run): used to check time offsets by run and initial PID studies | #** Monitoring launch ver12 completed (10 files from each run): used to check time offsets by run and initial PID studies | ||
#*** Files being combined at /volatile/halld/home/jrsteven/RunPeriod-2019-11/offline_monitoring/ver12_pass07/hd_root.root | #*** Files being combined at /volatile/halld/home/jrsteven/RunPeriod-2019-11/offline_monitoring/ver12_pass07/hd_root.root | ||
− | #** Monitoring launch ver16 completed: | + | #** Monitoring launch ver16 completed: Final monitoring launch 71350-71727 |
− | #* Geometric reconstruction update (Ahmed/Roman) | + | #** Production launch testing at NERSC ongoing |
+ | #* Geometric reconstruction update (Ahmed/Roman) https://halldweb.jlab.org/wiki/images/4/4a/GlueXDIRC_3Aug_AA.pdf | ||
#* FastDIRC update (Yunjie) | #* FastDIRC update (Yunjie) | ||
# [https://halldweb.jlab.org/wiki/index.php/April_20-21,_2020_DIRC#Action_items Follow-up on additional action items from workfest] (All) | # [https://halldweb.jlab.org/wiki/index.php/April_20-21,_2020_DIRC#Action_items Follow-up on additional action items from workfest] (All) |
Latest revision as of 12:50, 3 August 2020
Meeting Information
GlueX DIRC Meeting
Monday August 3, 2020
1:00 pm, EDT
Remote only
Connection Using Bluejeans
- To join via Polycom room system go to the IP Address: 199.48.152.152 (bjn.vc) and enter the meeting ID: 846453895.
- To join via a Web Browser, go to the page [1] https://bluejeans.com/846453895 .
- To join via phone, use one of the following numbers and the Conference ID: 846453895
- US or Canada: +1 408 740 7256 or
- US or Canada: +1 888 240 2560
- More information on connecting to bluejeans is available.
Agenda
- Announcements:
- DIRC startup plans for summer run (Bill, Justin, All)
- Run startup status: initial monitoring plots look OK.
- Interesting pattern for North OB LED, water in the diffuser?
- TRD/GEM options?
- DIRC commissioning analyses and 2020 studies (All)
- Spring 2020 monitoring and data production status (Justin)
- Monitoring launch ver12 completed (10 files from each run): used to check time offsets by run and initial PID studies
- Files being combined at /volatile/halld/home/jrsteven/RunPeriod-2019-11/offline_monitoring/ver12_pass07/hd_root.root
- Monitoring launch ver16 completed: Final monitoring launch 71350-71727
- Production launch testing at NERSC ongoing
- Monitoring launch ver12 completed (10 files from each run): used to check time offsets by run and initial PID studies
- Geometric reconstruction update (Ahmed/Roman) https://halldweb.jlab.org/wiki/images/4/4a/GlueXDIRC_3Aug_AA.pdf
- FastDIRC update (Yunjie)
- Spring 2020 monitoring and data production status (Justin)
- Follow-up on additional action items from workfest (All)
- 100M event MC samples required for ρ and φ data/MC comparisons:
- /volatile/halld/home/gxproj7/RunPeriod-2019-11/dircsim-2019_11-ver02/analysis/hd_root_gen_2pi_pass00.root
- /volatile/halld/home/gxproj7/RunPeriod-2019-11/dircsim-2019_11-ver02/analysis/hd_root_gen_2k_pass00.root
- 100M event MC samples required for ρ and φ data/MC comparisons:
- AOB