Difference between revisions of "August 31, 2020 DIRC"
From GlueXWiki
(Created page with "== Meeting Information == GlueX DIRC Meeting<br> Monday August 31, 2020<br> 1:00 pm, EDT<br> '''Remote only''' == Connection Using Bluejeans == # To join via Polycom room sy...") |
(→Agenda) |
||
Line 20: | Line 20: | ||
#* South OB LV group 9 problem [https://logbooks.jlab.org/entry/3836288] | #* South OB LV group 9 problem [https://logbooks.jlab.org/entry/3836288] | ||
#* [https://halldweb.jlab.org/wiki/images/4/45/GEM_TRD_setup_Aug2020.pdf TRD/GEM] installation Tuesday: | #* [https://halldweb.jlab.org/wiki/images/4/45/GEM_TRD_setup_Aug2020.pdf TRD/GEM] installation Tuesday: | ||
− | #** Field-off running for alignment, followed by production data at full rate | + | #** Field-off running for alignment (8 hours), followed by production data at full rate (24 hours) |
− | #* Data with Time-Over-Threshold | + | #* Data with Time-Over-Threshold gains equalized: [https://logbooks.jlab.org/entry/3834486 starting with run 72858] |
+ | # [https://halldweb.jlab.org/wiki/index.php/2020_Winter_-_2021_Spring Shutdown work planning] (Bill) | ||
# DIRC commissioning analyses and 2020 studies (All) | # DIRC commissioning analyses and 2020 studies (All) | ||
#* Spring 2020 monitoring and data production status (Justin) | #* Spring 2020 monitoring and data production status (Justin) |
Revision as of 11:37, 31 August 2020
Meeting Information
GlueX DIRC Meeting
Monday August 31, 2020
1:00 pm, EDT
Remote only
Connection Using Bluejeans
- To join via Polycom room system go to the IP Address: 199.48.152.152 (bjn.vc) and enter the meeting ID: 846453895.
- To join via a Web Browser, go to the page [1] https://bluejeans.com/846453895 .
- To join via phone, use one of the following numbers and the Conference ID: 846453895
- US or Canada: +1 408 740 7256 or
- US or Canada: +1 888 240 2560
- More information on connecting to bluejeans is available.
Agenda
- Announcements:
- DIRC operations and running (Bill, Justin, All)
- South OB LV group 9 problem [2]
- TRD/GEM installation Tuesday:
- Field-off running for alignment (8 hours), followed by production data at full rate (24 hours)
- Data with Time-Over-Threshold gains equalized: starting with run 72858
- Shutdown work planning (Bill)
- DIRC commissioning analyses and 2020 studies (All)
- Spring 2020 monitoring and data production status (Justin)
- Production launch testing at NERSC/PSC ongoing
- Geometric reconstruction update (Ahmed/Roman)
- FastDIRC update (Yunjie)
- Spring 2020 monitoring and data production status (Justin)
- Follow-up on additional action items from workfest (All)
- 100M event MC samples required for ρ and φ data/MC comparisons:
- /volatile/halld/home/gxproj7/RunPeriod-2019-11/dircsim-2019_11-ver02/analysis/hd_root_gen_2pi_pass00.root
- /volatile/halld/home/gxproj7/RunPeriod-2019-11/dircsim-2019_11-ver02/analysis/hd_root_gen_2k_pass00.root
- 100M event MC samples required for ρ and φ data/MC comparisons:
- AOB