Difference between revisions of "August 5, 2011 Design/Fab Meeting"

From GlueXWiki
Jump to: navigation, search
 
(2 intermediate revisions by the same user not shown)
Line 4: Line 4:
 
== Agenda ==
 
== Agenda ==
 
* ESH&Q minute http://lifeinthefastlane.com/2010/06/nail-gun-injuries/
 
* ESH&Q minute http://lifeinthefastlane.com/2010/06/nail-gun-injuries/
** Hall D trench box M:\12GeVUpgrade\Meetings\Project Team Meetings\Project Team Meetings - 2011\7-14-2011
+
 
** Student safety
+
 
* Announcements  
 
* Announcements  
 
**  training - up to date?
 
**  training - up to date?
** All hands meeting today
+
**  
* Co-op presentation (Stephanie)
+
* Interns Presentations (Caleb and Joe)
+
 
* CAD update - Chuck
 
* CAD update - Chuck
* Solenoid Test Status  - George*
+
* Hall D movie
 +
* Solenoid Test Status  - George/Josh*
 
* Solenoid install Status - Josh
 
* Solenoid install Status - Josh
* Solenoid replacement status - Tim
+
* Solenoid replacement status - Elton
* FDC construction update - Bill
+
* FDC construction update - Bill/Dave
* Mock up update - John
+
* Detector Cable Mock up update - John/Tom
 +
* BCAL assy test setup - Tim
 +
* Civil update - M:\facilities\Projects\12_GeV\Construction\Hall_D\Photos\Jul_2011
 +
* Infrastructure update -
 
* Fabrication/installation work - Tom
 
* Fabrication/installation work - Tom
 
* scheduled work - J:\Hall  D\schedules and budgets\manpower assignments
 
* scheduled work - J:\Hall  D\schedules and budgets\manpower assignments
  
==Outstanding Action Items==
+
== Action Items==
 
+
* Work out mock up with John/Tom
 +
* Get fdc and cdc hardware for mock up made - Tim/John
 +
* Modify rigging contract for JLAB solenoid work - Josh
 +
* Make movie file out of jt - Mike Beizer
 
==Minutes==
 
==Minutes==
 +
* Long pants will be worn in Hall D at all times until further notice.
 +
* No projector, had old fashioned discussions
 +
  
Discussed ESH@Q minutes and announcements. All students gave their presentations. Stephanie Mcarthy on BCAL readout production cooling calculations, Joseph Accolla on BCAL readout cooling tests and Caleb Massey on FDC wire position measurements. They can be found at M:\halld\Engineering\Presentations
+
**In attendance W. Crahen,  C. Hutton, V. Razmyslovich, J. Lagner, R. Getz, W. Sachleben,  Tim Whitlatch,  J. Conger, S. Mcarthy, G. Biallas, T Carstens, B. Bunton,  M. Stevens, S. Speigel, J. Thomason, J. Foyles, C. Heck, T. Mann, M. Beizer, A. Johnson, J. Ballard, M. Bear, A. Sitnikov, D. Butler, M. Devendorf
**In attendance W. Crahen,  J. Fochtman,  C. Hutton, V. Razmyslovich, J. Lagner, F. Martin, R. Getz,   W. Sachleben,  Tim Whitlatch,  N. Gomez, J. Conger, S. Mcarthy, J. Accolla, C. Massey,T Carstens
+

Latest revision as of 10:21, 5 August 2011

Friday August 5, 2011 at 8:15am At Jefferson Lab, the meeting will be held in room ARC 231

Agenda

  • Announcements
    • training - up to date?
  • CAD update - Chuck
  • Hall D movie
  • Solenoid Test Status - George/Josh*
  • Solenoid install Status - Josh
  • Solenoid replacement status - Elton
  • FDC construction update - Bill/Dave
  • Detector Cable Mock up update - John/Tom
  • BCAL assy test setup - Tim
  • Civil update - M:\facilities\Projects\12_GeV\Construction\Hall_D\Photos\Jul_2011
  • Infrastructure update -
  • Fabrication/installation work - Tom
  • scheduled work - J:\Hall D\schedules and budgets\manpower assignments

Action Items

  • Work out mock up with John/Tom
  • Get fdc and cdc hardware for mock up made - Tim/John
  • Modify rigging contract for JLAB solenoid work - Josh
  • Make movie file out of jt - Mike Beizer

Minutes

  • Long pants will be worn in Hall D at all times until further notice.
  • No projector, had old fashioned discussions


    • In attendance W. Crahen, C. Hutton, V. Razmyslovich, J. Lagner, R. Getz, W. Sachleben, Tim Whitlatch, J. Conger, S. Mcarthy, G. Biallas, T Carstens, B. Bunton, M. Stevens, S. Speigel, J. Thomason, J. Foyles, C. Heck, T. Mann, M. Beizer, A. Johnson, J. Ballard, M. Bear, A. Sitnikov, D. Butler, M. Devendorf