Difference between revisions of "August 8, 2014"

From GlueXWiki
Jump to: navigation, search
Line 10: Line 10:
  
 
* Trigger calibration status from sub-detectors
 
* Trigger calibration status from sub-detectors
 +
 +
*: new version of FCAL baseline calibration

Revision as of 09:56, 8 September 2014

  • CTP installation and testing
  • Test of the global trigger distribution (using BCAL north crates)
  • Global energy sum
  • BCAL cosmic trigger
  • BCAL cosmic trigger for FDC / CDC (plans)
  • Trigger calibration status from sub-detectors
  • new version of FCAL baseline calibration