Difference between revisions of "August 8, 2019 DIRC"
From GlueXWiki
(Created page with "== Meeting Information == GlueX DIRC Meeting<br> Thursday August 8, 2019<br> 1:00 pm, EDT<br> JLab F326 <br> == Connection Using Bluejeans == # To join via Polycom room syst...") |
(→Agenda) |
||
(10 intermediate revisions by 3 users not shown) | |||
Line 16: | Line 16: | ||
== Agenda == | == Agenda == | ||
− | # Announcements | + | # Announcements: |
+ | #* Fall 2019 run delayed: expected to start DIRC commissioning November 25 | ||
# Installation work: | # Installation work: | ||
− | #* Mirror studies and water tests (Bill, All) | + | #* South OB Mirror replacement update: [https://logbooks.jlab.org/entry/3713831 log] |
− | #* | + | #* Upper North OB partially installed (Mark and Tim) |
+ | #** Bar box gas fitting issue resolved (Mark and Tim) | ||
+ | #** Gasket interference issue (Mark and Tim) | ||
+ | #** Installation of cables/fibers/distribution boxes (Bill) | ||
+ | #* Mirror studies and water tests (Bill, All) [https://logbooks.jlab.org/entry/3709114 Surface voltage test] [https://logbooks.jlab.org/entry/3713852 losing coating] [https://logbooks.jlab.org/entry/3716403 latest update] [https://logbooks.jlab.org/entry/3716606 summary table] | ||
+ | #* Tape (mirror-strongback) in water study (Bill, All) [https://logbooks.jlab.org/entry/3716065 Issue] [https://logbooks.jlab.org/entry/3716588 test] | ||
#* Next steps (All) | #* Next steps (All) | ||
# [[Spring 2019 DIRC Commissioning|Spring 2019 DIRC Commissioning Analysis]] (All) | # [[Spring 2019 DIRC Commissioning|Spring 2019 DIRC Commissioning Analysis]] (All) | ||
#* Commissioning LUT analyses (All) | #* Commissioning LUT analyses (All) | ||
#** Cherenkov ring fit (Roman) | #** Cherenkov ring fit (Roman) | ||
− | #** | + | #**[https://halldweb.jlab.org/wiki/images/e/e9/Commissioning_AA.pdf Systematics [Survey vs Momentum Direction Rotation vs G4 Simulation] ] (Ahmed) |
+ | #***[http://web-docs.gsi.de/~aali/ahmeddirc/pages/glx_corr_mom.html Momentum Direction Rotation (Best SPR Method)] | ||
+ | #***[http://web-docs.gsi.de/~aali/v2.mp4 Visualization 1] [http://web-docs.gsi.de/~aali/v3.mp4 Visualization 2] | ||
#* Commissioning FastDIRC update (Yunjie) | #* Commissioning FastDIRC update (Yunjie) | ||
# Software/simulations | # Software/simulations |
Latest revision as of 12:39, 8 August 2019
Meeting Information
GlueX DIRC Meeting
Thursday August 8, 2019
1:00 pm, EDT
JLab F326
Connection Using Bluejeans
- To join via Polycom room system go to the IP Address: 199.48.152.152 (bjn.vc) and enter the meeting ID: 846453895.
- To join via a Web Browser, go to the page [1] https://bluejeans.com/846453895 .
- To join via phone, use one of the following numbers and the Conference ID: 846453895
- US or Canada: +1 408 740 7256 or
- US or Canada: +1 888 240 2560
- More information on connecting to bluejeans is available.
Agenda
- Announcements:
- Fall 2019 run delayed: expected to start DIRC commissioning November 25
- Installation work:
- South OB Mirror replacement update: log
- Upper North OB partially installed (Mark and Tim)
- Bar box gas fitting issue resolved (Mark and Tim)
- Gasket interference issue (Mark and Tim)
- Installation of cables/fibers/distribution boxes (Bill)
- Mirror studies and water tests (Bill, All) Surface voltage test losing coating latest update summary table
- Tape (mirror-strongback) in water study (Bill, All) Issue test
- Next steps (All)
- Spring 2019 DIRC Commissioning Analysis (All)
- Commissioning LUT analyses (All)
- Cherenkov ring fit (Roman)
- Systematics [Survey vs Momentum Direction Rotation vs G4 Simulation ] (Ahmed)
- Commissioning FastDIRC update (Yunjie)
- Commissioning LUT analyses (All)
- Software/simulations
- FastDIRC geometry implementation and alignment work (Cris/Yunjie)
- Software overview and tasks (All)
- AOB