(Agenda)
(Agenda)
 
(8 intermediate revisions by 3 users not shown)
Line 19: Line 19:
 
#* Fall 2019 run delayed: expected to start DIRC commissioning November 25
 
#* Fall 2019 run delayed: expected to start DIRC commissioning November 25
 
# Installation work:
 
# Installation work:
#* Mirror studies and water tests (Bill, All)
+
#* South OB Mirror replacement update: [https://logbooks.jlab.org/entry/3713831 log]
#* Epoxy test samples to prevent corrosion of exposed aluminum surfaces (Tim, Bill, All)
+
#* Upper North OB partially installed (Mark and Tim)
 +
#** Bar box gas fitting issue resolved (Mark and Tim)
 +
#** Gasket interference issue (Mark and Tim)
 +
#** Installation of cables/fibers/distribution boxes (Bill)
 +
#* Mirror studies and water tests (Bill, All) [https://logbooks.jlab.org/entry/3709114 Surface voltage test] [https://logbooks.jlab.org/entry/3713852 losing coating] [https://logbooks.jlab.org/entry/3716403 latest update] [https://logbooks.jlab.org/entry/3716606 summary table]
 +
#* Tape (mirror-strongback) in water study (Bill, All) [https://logbooks.jlab.org/entry/3716065 Issue] [https://logbooks.jlab.org/entry/3716588 test]
 
#* Next steps (All)
 
#* Next steps (All)
 
# [[Spring 2019 DIRC Commissioning|Spring 2019 DIRC Commissioning Analysis]] (All)
 
# [[Spring 2019 DIRC Commissioning|Spring 2019 DIRC Commissioning Analysis]] (All)
 
#* Commissioning LUT analyses (All)
 
#* Commissioning LUT analyses (All)
 
#** Cherenkov ring fit (Roman)  
 
#** Cherenkov ring fit (Roman)  
#** Cherenkov Systematics (Ahmed)
+
#**[https://halldweb.jlab.org/wiki/images/e/e9/Commissioning_AA.pdf Systematics [Survey vs Momentum Direction Rotation vs G4 Simulation] ] (Ahmed)  
#**[https://halldweb.jlab.org/wiki/images/a/aa/G_commitionning.pdf Survey vs Momentum Direction Rotation Corrections] (Ahmed)  
+
#***[http://web-docs.gsi.de/~aali/ahmeddirc/pages/glx_corr_mom.html  Momentum Direction Rotation (Best SPR Method)]
#*[http://web-docs.gsi.de/~aali/ahmeddirc/pages/glx_corr_mom.html  Momentum Direction Rotation (Best SPR Method)]
+
#***[http://web-docs.gsi.de/~aali/v2.mp4 Visualization 1] [http://web-docs.gsi.de/~aali/v3.mp4 Visualization 2]
#*[http://web-docs.gsi.de/~aali/v2.mp4 Visualization 1]
+
#*[http://web-docs.gsi.de/~aali/v3.mp4 Visualization 2]
+
 
+
 
#* Commissioning FastDIRC update (Yunjie)
 
#* Commissioning FastDIRC update (Yunjie)
 
# Software/simulations
 
# Software/simulations

Latest revision as of 12:39, 8 August 2019

Meeting Information

GlueX DIRC Meeting
Thursday August 8, 2019
1:00 pm, EDT
JLab F326

Connection Using Bluejeans

  1. To join via Polycom room system go to the IP Address: 199.48.152.152 (bjn.vc) and enter the meeting ID: 846453895.
  2. To join via a Web Browser, go to the page [1] https://bluejeans.com/846453895 .
  3. To join via phone, use one of the following numbers and the Conference ID: 846453895
    • US or Canada: +1 408 740 7256 or
    • US or Canada: +1 888 240 2560
  4. More information on connecting to bluejeans is available.

Agenda

  1. Announcements:
    • Fall 2019 run delayed: expected to start DIRC commissioning November 25
  2. Installation work:
    • South OB Mirror replacement update: log
    • Upper North OB partially installed (Mark and Tim)
      • Bar box gas fitting issue resolved (Mark and Tim)
      • Gasket interference issue (Mark and Tim)
      • Installation of cables/fibers/distribution boxes (Bill)
    • Mirror studies and water tests (Bill, All) Surface voltage test losing coating latest update summary table
    • Tape (mirror-strongback) in water study (Bill, All) Issue test
    • Next steps (All)
  3. Spring 2019 DIRC Commissioning Analysis (All)
  4. Software/simulations
    • FastDIRC geometry implementation and alignment work (Cris/Yunjie)
  5. Software overview and tasks (All)
  6. AOB