Difference between revisions of "August 8, 2019 DIRC"

From GlueXWiki
Jump to: navigation, search
(Agenda)
(Agenda)
Line 25: Line 25:
 
#* Commissioning LUT analyses (All)
 
#* Commissioning LUT analyses (All)
 
#** Cherenkov ring fit (Roman)  
 
#** Cherenkov ring fit (Roman)  
#** Cherenkov Systematics (Ahmed)
+
#**[https://halldweb.jlab.org/wiki/images/e/e9/Commissioning_AA.pdf Systematics [Survey vs Momentum Direction Rotation vs G4 Simulation] ] (Ahmed)  
#**[https://halldweb.jlab.org/wiki/images/a/aa/G_commitionning.pdf Survey vs Momentum Direction Rotation Corrections] (Ahmed)  
+
#***[http://web-docs.gsi.de/~aali/ahmeddirc/pages/glx_corr_mom.html  Momentum Direction Rotation (Best SPR Method)]
#*[http://web-docs.gsi.de/~aali/ahmeddirc/pages/glx_corr_mom.html  Momentum Direction Rotation (Best SPR Method)]
+
#***[http://web-docs.gsi.de/~aali/v2.mp4 Visualization 1] [http://web-docs.gsi.de/~aali/v3.mp4 Visualization 2]
#*[http://web-docs.gsi.de/~aali/v2.mp4 Visualization 1]
+
#*[http://web-docs.gsi.de/~aali/v3.mp4 Visualization 2]
+
 
+
 
#* Commissioning FastDIRC update (Yunjie)
 
#* Commissioning FastDIRC update (Yunjie)
 
# Software/simulations
 
# Software/simulations

Revision as of 11:17, 8 August 2019

Meeting Information

GlueX DIRC Meeting
Thursday August 8, 2019
1:00 pm, EDT
JLab F326

Connection Using Bluejeans

  1. To join via Polycom room system go to the IP Address: 199.48.152.152 (bjn.vc) and enter the meeting ID: 846453895.
  2. To join via a Web Browser, go to the page [1] https://bluejeans.com/846453895 .
  3. To join via phone, use one of the following numbers and the Conference ID: 846453895
    • US or Canada: +1 408 740 7256 or
    • US or Canada: +1 888 240 2560
  4. More information on connecting to bluejeans is available.

Agenda

  1. Announcements:
    • Fall 2019 run delayed: expected to start DIRC commissioning November 25
  2. Installation work:
    • Mirror studies and water tests (Bill, All)
    • Epoxy test samples to prevent corrosion of exposed aluminum surfaces (Tim, Bill, All)
    • Next steps (All)
  3. Spring 2019 DIRC Commissioning Analysis (All)
  4. Software/simulations
    • FastDIRC geometry implementation and alignment work (Cris/Yunjie)
  5. Software overview and tasks (All)
  6. AOB