August 9, 2018 DIRC

From GlueXWiki
Revision as of 10:07, 8 August 2018 by Jrsteven (Talk | contribs) (Created page with "== Meeting Information == GlueX DIRC Analysis Meeting<br> Thursday August 9, 2018<br> 10:00 am, EDT<br> JLab room A110<br> == Connection Using Bluejeans == # To join via Pol...")

(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to: navigation, search

Meeting Information

GlueX DIRC Analysis Meeting
Thursday August 9, 2018
10:00 am, EDT
JLab room A110

Connection Using Bluejeans

  1. To join via Polycom room system go to the IP Address: 199.48.152.152 (bjn.vc) and enter the meeting ID: 846453895.
  2. To join via a Web Browser, go to the page [1] https://bluejeans.com/846453895 .
  3. To join via phone, use one of the following numbers and the Conference ID: 846453895
    • US or Canada: +1 408 740 7256 or
    • US or Canada: +1 888 240 2560
  4. More information on connecting to bluejeans is available.

Agenda

  1. Announcements
    • New meeting time: Doodle poll
  2. Optical box
    • Fabrication status update (Ernie and Jason)
      • Component QA and assembly status at Bates
      • Window flange modification
      • Assembly sequence and testing plans at Bates
    • Dark box design (Jason)
    • PMT test fixture and cookies (Maria)
  3. Installation schedule discussion:
    • Requirements for mechanical install of optical box: Aug 10 installation schedule
      • Ernie to deliver on Sunday evening, August 12
      • Packing list from Bates (Jason)
      • Goals (reduce risk for final installation):
        • Test water tightness of optical box and interface with bar boxes
        • Flow water through full system and establish controls, N2 purge, etc.
  4. Mirror box laser alignment
    • Update on geometry and laser projections (Bill)
  5. Cabling and DAQ integration
    • Cabling progress (Tim, Fernando)
    • Installation of VXS crate and SSP modules complete, initial integration into DAQ underway by Sasha and Sergei.
  6. Simulation studies (Maria and Roman)
    • Finalizing DIRC "as-build" geometry: support frames, etc. (Yunjie, Maria)
    • Documentation of LUT algorithm by Maria
    • Implementation of reconstruction in PID library underway (Justin)
  7. MAPMT testing (Bill and Andrew)
    • Magnetic field tests underway
    • Update on ADC fitting procedure
  8. Commissioning plans
  9. Reminder: Addressing ERR review recommendations
    • Recommendations pertaining to Fall 2018 DIRC commissioning should be addressed by August 20 (close of Hall D for beam)
  10. AOB