Difference between revisions of "BCAL"
From GlueXWiki
(→Hardware and Construction) |
(→Hardware and Construction) |
||
Line 12: | Line 12: | ||
* See Chapter 3.4 of the [https://halldweb.jlab.org/doc-private/DocDB/ShowDocument?docid=2511 Hall D / GlueX Technical Construction Report] | * See Chapter 3.4 of the [https://halldweb.jlab.org/doc-private/DocDB/ShowDocument?docid=2511 Hall D / GlueX Technical Construction Report] | ||
* Details of the fabrication, quality assurance and historical data can be found at [[BCAL Construction]] | * Details of the fabrication, quality assurance and historical data can be found at [[BCAL Construction]] | ||
− | * | + | * [http://www.jlab.org/Hall-D/test/TranslationTable Visual browser for electronic channel assignments] |
* [[Media:SiPM assignments.png | Labeling of SiPM arrays]] | * [[Media:SiPM assignments.png | Labeling of SiPM arrays]] | ||
Revision as of 15:04, 10 July 2020
Contents
References
- Adhikari et al., "The GlueX Beamline and Detector", arXiv:2005.14272.
- T.D. Beattie et al., "Construction and performance of the barrel electromagnetic calorimeter for the GlueX experiment", Nucl. Instrum. & Meth. A896, 24-42 (2018), [NIM A], [GlueX DocDB].
- HDBCAL Log Book
- Complete list of GlueX Technical Publications can be found at Instrumentation Publications.
Calorimetry Meetings
Hardware and Construction
- See Chapter 3.4 of the Hall D / GlueX Technical Construction Report
- Details of the fabrication, quality assurance and historical data can be found at BCAL Construction
- Visual browser for electronic channel assignments
- Labeling of SiPM arrays
Online Information for Experts
Calibration
- Timing, time-walk, position, attenuation length, and gain ratios
- Pi0 gain calibration
Monitoring
- Monitoring plots
- LED system and monitoring
- BCAL hadronic efficiencies
- Reconstruction efficiency using Costhe Method
- Efficiency