Difference between revisions of "BCAL Commissioning"

From GlueXWiki
Jump to: navigation, search
(Plans)
Line 8: Line 8:
 
## Check gains, including individual SiPMs into the sums.
 
## Check gains, including individual SiPMs into the sums.
 
# Develop scripts for analysis (students, Andrei)
 
# Develop scripts for analysis (students, Andrei)
 +
 +
== HOWTO Documentation ==
 +
 +
* Coming soon
  
 
== Agenda/Minutes By Date ==
 
== Agenda/Minutes By Date ==
  
 
* [[May 27, 2014 BCAL Commissioning]]
 
* [[May 27, 2014 BCAL Commissioning]]

Revision as of 12:12, 28 May 2014

Upcoming Tasks

  1. Check fixes with LED pulser data on the south as well as the north side.
  2. Keep monitoring pedestals, periodic fluctuations with temperatures in hall/crates.
  3. Check ADV values of trigger scintillators to ensure their HV is set correctly.
  4. Take more cosmics runs when everything is working.
    1. Check energy depositions in cells, starting with vertically oriented ones.
    2. Check gains, including individual SiPMs into the sums.
  5. Develop scripts for analysis (students, Andrei)

HOWTO Documentation

  • Coming soon

Agenda/Minutes By Date