# Check hardware fixes with LED pulser data on the south as well as the north side. | # Check hardware fixes with LED pulser data on the south as well as the north side. | ||
− | # Keep monitoring pedestals, periodic fluctuations with temperatures in | + | # Keep monitoring pedestals, periodic fluctuations with temperatures in Hall/crates. |
# Check ADV values of trigger scintillators to ensure their HV is set correctly. | # Check ADV values of trigger scintillators to ensure their HV is set correctly. | ||
# Take more cosmics runs when everything is working. | # Take more cosmics runs when everything is working. |
Revision as of 12:14, 28 May 2014
Upcoming Tasks
- Check hardware fixes with LED pulser data on the south as well as the north side.
- Keep monitoring pedestals, periodic fluctuations with temperatures in Hall/crates.
- Check ADV values of trigger scintillators to ensure their HV is set correctly.
- Take more cosmics runs when everything is working.
- Check energy depositions in cells, starting with vertically oriented ones.
- Check gains, including individual SiPMs into the sums.
- Develop scripts for analysis.
HOWTO Documentation