Difference between revisions of "BCAL Commissioning"

From GlueXWiki
Jump to: navigation, search
(Upcoming Tasks)
(Upcoming Tasks)
Line 2: Line 2:
  
 
# Check hardware fixes with LED pulser data on the south as well as the north side.
 
# Check hardware fixes with LED pulser data on the south as well as the north side.
# Keep monitoring pedestals, periodic fluctuations with temperatures in hall/crates.
+
# Keep monitoring pedestals, periodic fluctuations with temperatures in Hall/crates.
 
# Check ADV values of trigger scintillators to ensure their HV is set correctly.
 
# Check ADV values of trigger scintillators to ensure their HV is set correctly.
 
# Take more cosmics runs when everything is working.
 
# Take more cosmics runs when everything is working.

Revision as of 12:14, 28 May 2014

Upcoming Tasks

  1. Check hardware fixes with LED pulser data on the south as well as the north side.
  2. Keep monitoring pedestals, periodic fluctuations with temperatures in Hall/crates.
  3. Check ADV values of trigger scintillators to ensure their HV is set correctly.
  4. Take more cosmics runs when everything is working.
    1. Check energy depositions in cells, starting with vertically oriented ones.
    2. Check gains, including individual SiPMs into the sums.
  5. Develop scripts for analysis.