Upcoming Tasks

  1. Check hardware fixes with LED pulser data on the south as well as the north side.
  2. Keep monitoring pedestals, periodic fluctuations with temperatures in hall/crates.
  3. Check ADV values of trigger scintillators to ensure their HV is set correctly.
  4. Take more cosmics runs when everything is working.
    1. Check energy depositions in cells, starting with vertically oriented ones.
    2. Check gains, including individual SiPMs into the sums.
  5. Develop scripts for analysis.