Difference between revisions of "BCAL Readout Review"

From GlueXWiki
Jump to: navigation, search
(The GlueX/Hall D Calorimeter Readout Review)
(Tentative Agenda Topics)
Line 7: Line 7:
 
=== Tentative Agenda Topics ===
 
=== Tentative Agenda Topics ===
  
# Status/overview of Bcal construction, geometry - Eugene/George/Zisis
+
# Status/overview of Bcal construction, geometry - Zisis
 
# Calorimeter requirements and resolution - Elton
 
# Calorimeter requirements and resolution - Elton
 
#* readout specifications
 
#* readout specifications

Revision as of 13:55, 30 June 2009

The GlueX/Hall D Calorimeter Readout Review

The Review will be held at Jefferson Lab on July 21, 2009.

Tentative Agenda Topics

  1. Status/overview of Bcal construction, geometry - Zisis
  2. Calorimeter requirements and resolution - Elton
    • readout specifications
    • number of p.e.
    • light collection
    • dark rate
    • dynamic range
    • gain
    • calibration
  3. Status of sensor development (Carl)
    • SensL SiPM
    • Hamamatsu SiPM
    • Fine mesh PMTs
  4. Electrical requirements - Fernando
    • readout granularity
    • discrimination
    • FADCs, TDCs
    • gain stabilization / cooling
  5. Simulations - Sasha
    • Backgrounds
    • Acceptance gap bcal-fcal
  6. Infrastructure/production at USM? - Will
  7. Cost and Schedule - Eugene/Elton