Difference between revisions of "BCAL Reconstruction Meeting 2013-09-17"
From GlueXWiki
(→Agenda) |
(→Agenda) |
||
Line 25: | Line 25: | ||
# Action Items | # Action Items | ||
# Updates | # Updates | ||
− | ## [[Media: | + | ## [[Media:Levine_bcal_slides_20130917.pdf Will]] |
# Discuss and prioritize the Reconstruction Issues and prepare for Collaboration Meeting: | # Discuss and prioritize the Reconstruction Issues and prepare for Collaboration Meeting: | ||
## [https://halldweb1.jlab.org/wiki/index.php/GlueX-Collaboration-Oct-2013 October 2013 Meeting] | ## [https://halldweb1.jlab.org/wiki/index.php/GlueX-Collaboration-Oct-2013 October 2013 Meeting] | ||
# Any other business | # Any other business |
Revision as of 09:59, 17 September 2013
Teleconference Time: 11:15 a.m. EDT
- ESNET (Number is 8542553) and EVO session (GlueX Calorimetry meeting room)
- Phone connection only upon request.
- +1-866-740-1260 : US+Canada
- +1-303-248-0285 : International
- then enter participant code: 3421244# (remember the "#").
- or www.readytalk.com (and code without the #)
Participant Direct Lines
- JLab Phone: in CC F326 is 757-269-6460 (usual room)
- JLab Phone in CC L207 is 757-269-7084
- Phone in the Regina Video-conference Suite is 306-585-4204
Action Items
- BCAL Reconstruction Issues
- BCAL Reconstruction Algorithms
- Introduce FPGA timing algorithm to derive hit times from fADC
- Gather reconstruction conditions for outer layers on the Wiki (consider "curvature effect")
Agenda
- Action Items
- Updates
- Discuss and prioritize the Reconstruction Issues and prepare for Collaboration Meeting:
- Any other business