Difference between revisions of "BCAL Reconstruction Meeting 2015-01-08"

From GlueXWiki
Jump to: navigation, search
(Agenda)
(Agenda)
Line 38: Line 38:
 
# Announcements
 
# Announcements
 
# Action Items
 
# Action Items
# Review of Reconstruction issues
+
# Review of BCAL Reconstruction issues
 
# Commissioning
 
# Commissioning
 
# Calibration
 
# Calibration

Revision as of 11:13, 6 January 2015

Video Conferencing Information

Meeting Time: 11:00 a.m. EDT

  1. To join via a Web Browser, go to the page [1] https://bluejeans.com/907185247.
  2. To join via Polycom room system go to the IP Address: 199.48.152.152 (bjn.vc) and enter the meeting ID: 907185247.
  3. To join via phone, use one of the following numbers and the Conference ID: 907185247.
    • US or Canada: +1 408 740 7256 or
    • US or Canada: +1 888 240 2560
  4. Upon connection all microphones are automatically muted. To unmute your mike on a Polycom or equivalent unit, enter *4. Unmuting on a computer is trivial as there is a microphone button than can be clicked.
  5. More information on connecting to bluejeans is available.

Participant Direct Lines

  • JLab Phone: in CC F326 is 757-269-6460 (usual room)
  • JLab Phone in CC L207 is 757-269-7084
  • Phone in the Regina Video-conference Suite is 306-585-4204

References

  1. BCAL Reconstruction Issues
  2. BCAL Reconstruction Algorithms
  3. Will's reconstructed energy info

Action Items

  1. Ask Richard Jones about Truth info from BCAL hadronic showers (Zisis, Will L., Justin)
  2. Shower curvature tables: compare KLOE to IU codes: check gap in cluster handling between codes (Tegan, Andrei)
  3. z-coordinate determination from up/down amplitude ratio (Tegan, Andrei)
  4. Cleanup: (Tegan, Will L.)
    1. Set variable “failures” to a number other than zero (e.g. -9999 or similar)
    2. Comb code for constants to be pulled out into a database
  5. Measure data pedestals using LV=0 setting (Mark)
  6. Sampling fraction tables (Tegan)

Agenda

  1. Announcements
  2. Action Items
  3. Review of BCAL Reconstruction issues
  4. Commissioning
  5. Calibration
    1. Calibration Constants (Elton)
    2. Cosmics data analysis update (Tegan)
  6. Simulations
    1. BDT effort status quo & plans - (Justin, Tegan)
  7. Any other business

Minutes

Attendees: