BCAL Reconstruction Meeting 2015-01-22

From GlueXWiki
Revision as of 15:26, 27 January 2015 by Zisis (Talk | contribs)

Jump to: navigation, search

Video Conferencing Information

Meeting Time: 11:00 a.m. EDT

  1. To join via a Web Browser, go to the page [1] https://bluejeans.com/907185247.
  2. To join via Polycom room system go to the IP Address: 199.48.152.152 (bjn.vc) and enter the meeting ID: 907185247.
  3. To join via phone, use one of the following numbers and the Conference ID: 907185247.
    • US or Canada: +1 408 740 7256 or
    • US or Canada: +1 888 240 2560
  4. Upon connection all microphones are automatically muted. To unmute your mike on a Polycom or equivalent unit, enter *4. Unmuting on a computer is trivial as there is a microphone button than can be clicked.
  5. More information on connecting to bluejeans is available.

Participant Direct Lines

  • JLab Phone: in CC F326 is 757-269-6460 (usual room)
  • JLab Phone in CC L207 is 757-269-7084
  • Phone in the Regina Video-conference Suite is 306-585-4204

References

  1. BCAL Reconstruction Issues
  2. BCAL Reconstruction Algorithms
  3. Will's reconstructed energy info

Action Items

  1. Feedback to Elton - GlueX-doc-2618 and GlueX-doc-2622 (All)
  2. 12 bit ADC - ask Sean Dobbs (Zisis)
  3. Elton's low-level coefficients into ccdb - ask Sean Dobbs (Zisis)
  4. Match with tracks - ask Paul, Simon (Zisis)
  5. Check new dark hits code after David's adjustments (Tegan)
  6. Shower curvature tables: compare KLOE to IU codes: check gap in cluster handling between codes (Tegan, Andrei)
  7. z-coordinate determination from up/down amplitude ratio (Tegan, Andrei)
  8. Cleanup: (Tegan, Will L.)
    1. Set variable “failures” to a number other than zero (e.g. -9999 or similar)
    2. Comb code for constants to be pulled out into a database
  9. Measure data pedestals using LV=0 setting (Mark)
  10. Sampling fraction tables (Tegan)

Agenda

  1. Announcements
  2. Action Items
  3. Prioritize BCAL Reconstruction Issues
  4. Commissioning
    1. Pedestal skims (Tegan)
  5. Calibration
  6. Simulations
    1. BDT effort (Tegan/Justin)
  7. Any other business

Minutes

Attendees: David, Will M. (JLab), Will L. (CMU), Justin (MIT), Christine, George (Athens), Tegan, Ahmed, Andrei, Zisis (Regina)

  1. Announcements: Justin was at Regina last week working with the group on BDT. An undergraduate student (Laura Teigrob) will be working with Tegan on the pedestals, a.o.
  2. Action Items:
    1. Elton requested feedback on his two documents.
    2. No reply from Sean yet.
    3. Sean and Mark will work together on this; a) single FADC time slope constant, b) t-w corrections will follow a four-parameter equation, c) postpone TDC work on BCAL for now.
    4. Track matching: Justin reported that this is going well and provide some info, for example, for run 2400:

[2]. Put your mouse over the 'Matching2' box and you'll see the BCAL DeltaPhi and DeltaZ matches with tracks (screenshot below). Or go to the direct link [3]

  1. Prioritize BCAL Reconstruction Issues
  2. Commissioning
    1. Pedestal skims (Tegan)
  3. Calibration
  4. Simulations
    1. BDT effort (Tegan/Justin)
  5. Any other business