Difference between revisions of "BCAL Reconstruction Meeting 2015-08-06"

From GlueXWiki
Jump to: navigation, search
(Agenda)
(Agenda)
Line 41: Line 41:
 
# Commissioning Efforts
 
# Commissioning Efforts
 
## Effective Velocities and Time Offsets (George)
 
## Effective Velocities and Time Offsets (George)
## Time-walk corrections (Noemi)[http://argus.phys.uregina.ca/gluex/DocDB/0027/002789/003/twalkTimingRuns.pdf]
+
## Time-walk corrections (Noemi)[http://argus.phys.uregina.ca/gluex/DocDB/0027/002789/004/twalkTimingRuns.pdf]
 
## Layer efficiencies (Ahmed) [https://halldweb1.jlab.org/wiki/images/2/2c/BCAL_EFF_Reconstruction_Aug52015.pdf]
 
## Layer efficiencies (Ahmed) [https://halldweb1.jlab.org/wiki/images/2/2c/BCAL_EFF_Reconstruction_Aug52015.pdf]
 
## DigiHits wrap up (Tegan)
 
## DigiHits wrap up (Tegan)

Revision as of 12:22, 6 August 2015

Video Conferencing Information

Meeting Time: 11:00 a.m. EDT

  1. To join via a Web Browser, go to the page [1] https://bluejeans.com/907185247.
  2. To join via Polycom room system go to the IP Address: 199.48.152.152 (bjn.vc) and enter the meeting ID: 907185247.
  3. To join via phone, use one of the following numbers and the Conference ID: 907185247.
    • US or Canada: +1 408 740 7256 or
    • US or Canada: +1 888 240 2560
  4. Upon connection all microphones are automatically muted. To unmute your mike on a Polycom or equivalent unit, enter *4. Unmuting on a computer is trivial as there is a microphone button than can be clicked.
  5. More information on connecting to bluejeans is available.

Participant Direct Lines

  • JLab Phone: in CC F326 is 757-269-6460 (usual room)
  • JLab Phone in CC L207 is 757-269-7084
  • Phone in the Regina Video-conference Suite is 306-585-4204

References

  1. BCAL Reconstruction Issues
  2. BCAL Reconstruction Algorithms
  3. Will's reconstructed energy info

Action Items

  1. Make some plots that clarify the need for implementation of "shower curvature" information into the reconstruction.
  2. Determine up/down gain ratios for spring data (Mark)
  1. High priority items
    1. BCAL and FCAL z coordinates: some are referenced to the center of the target, not the global coordinate system.
  2. Low priority items
    1. z-coordinate determination from up/down amplitude ratio
    2. Sampling fraction tables
    3. Code Cleanup

Agenda

  1. Announcements
  2. Action Items
  3. Commissioning Efforts
    1. Effective Velocities and Time Offsets (George)
    2. Time-walk corrections (Noemi)[2]
    3. Layer efficiencies (Ahmed) [3]
    4. DigiHits wrap up (Tegan)
  4. Reconstruction
    1. Update (Will M.) [4]
  5. Simulations
  6. Any other business

Minutes

Attendees: