BCAL Startup Checkout List 2014

From GlueXWiki
Revision as of 14:20, 12 February 2014 by Elton (Talk | contribs) (Created page with "==DAQ== * Initial readout of pedestals (3 crates) * Install remaining CPUs * Readout FADC and F1 TDC crates ==Power MPPCs== * Connection to network * Connect chillers (power an...")

(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to: navigation, search

DAQ

  • Initial readout of pedestals (3 crates)
  • Install remaining CPUs
  • Readout FADC and F1 TDC crates

Power MPPCs

  • Connection to network
  • Connect chillers (power and connections to manifold)
  • Install rotometers on upstream and downstream

Slow Controls

  • Read back T and Humidity upstream
  • Read back T and Humidity downstream
  • Read back of RTDs on cooling plates upstream
  • Read back of RTDs on cooling plates downstream
  • Install interlock of chiller and MPPC power to humidity and temperature signals

LED monitoring

  • Replace translation boards with correct assignment
  • Install MOD crate
  • Complete cabling to crate
  • Connect MPOD and VME crates to network

Computers ?