Difference between revisions of "BLTWG Active Collimator Interface Meeting"

From GlueXWiki
Jump to: navigation, search
(Created page with "===Organization=== * Time: 10:00 EST * Place: JLab CC F326, ESNET and [http://research.seevogh.com Seevogh] ?? * Connecting: instructions are [[Tagged Beam Group Biweekly Meetin...")
 
Line 5: Line 5:
 
* Present:
 
* Present:
 
----
 
----
 +
===Action items from 1/14/2013 meeting ===
 +
A team composed of John Musson, Trent Allison, Alexander Somov, Igor Senderovich, Pete Francis, Brian Bevins, Scott Higgins will meet within two weeks to draft hardware requirements for an FPGA-based PCB that will make collimator data available to a PC104-based IOC to do the FFB calculations and magnet controls. The group will specify the incoming signals (voltages, bandwidth, etc.) as well as any outputs from the PCB that Hall D will require.
  
 
===Agenda===
 
===Agenda===

Revision as of 19:49, 4 February 2013

Organization

  • Time: 10:00 EST
  • Place: JLab CC F326, ESNET and Seevogh ??
  • Connecting: instructions are here
  • Present:

Action items from 1/14/2013 meeting

A team composed of John Musson, Trent Allison, Alexander Somov, Igor Senderovich, Pete Francis, Brian Bevins, Scott Higgins will meet within two weeks to draft hardware requirements for an FPGA-based PCB that will make collimator data available to a PC104-based IOC to do the FFB calculations and magnet controls. The group will specify the incoming signals (voltages, bandwidth, etc.) as well as any outputs from the PCB that Hall D will require.

Agenda


Notes

Relevant Documents

Bandwidths

ActColBW.png PMT-5Rresp.png

System Diagram

Colli1.png