Difference between revisions of "BLTWG Active Collimator Interface Meeting"

From GlueXWiki
Jump to: navigation, search
m (Notes)
 
(One intermediate revision by the same user not shown)
Line 19: Line 19:
 
==== Bandwidths ====
 
==== Bandwidths ====
 
{|
 
{|
| [[Image:ActColBW.png|400px]] || [[Image:PMT-5Rresp.png|400px]]
+
| [[Image:ActColBW.png|400px]] || [[Image:PMT-5Rresp.png|400px]]
 +
|-
 +
| Beam motion spectrum from the 2012 Hall B beam test <br> using the 10<sup>10</sup> amplifier gain setting
 +
|| Response spectrum of the PMT-5R amplifiers at various gain modes
 
|}
 
|}
  
==== System Diagram ====
+
==== Prototype System Diagram ====
 
[[Image:Colli1.png|600px]]
 
[[Image:Colli1.png|600px]]

Latest revision as of 20:02, 4 February 2013

Organization

  • Time: 10:00 EST
  • Place: JLab CC F326, ESNET and Seevogh ??
  • Connecting: instructions are here
  • Present:

Action items from 1/14/2013 meeting

A team composed of John Musson, Trent Allison, Alexander Somov, Igor Senderovich, Pete Francis, Brian Bevins, Scott Higgins will meet within two weeks to draft hardware requirements for an FPGA-based PCB that will make collimator data available to a PC104-based IOC to do the FFB calculations and magnet controls. The group will specify the incoming signals (voltages, bandwidth, etc.) as well as any outputs from the PCB that Hall D will require.

Agenda


Notes

Relevant Documents

Bandwidths

ActColBW.png PMT-5Rresp.png
Beam motion spectrum from the 2012 Hall B beam test
using the 1010 amplifier gain setting
Response spectrum of the PMT-5R amplifiers at various gain modes

Prototype System Diagram

Colli1.png