BLTWG Active Collimator Interface Meeting

From GlueXWiki
Revision as of 20:02, 4 February 2013 by Senderovich (Talk | contribs) (Notes)

(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to: navigation, search

Organization

  • Time: 10:00 EST
  • Place: JLab CC F326, ESNET and Seevogh ??
  • Connecting: instructions are here
  • Present:

Action items from 1/14/2013 meeting

A team composed of John Musson, Trent Allison, Alexander Somov, Igor Senderovich, Pete Francis, Brian Bevins, Scott Higgins will meet within two weeks to draft hardware requirements for an FPGA-based PCB that will make collimator data available to a PC104-based IOC to do the FFB calculations and magnet controls. The group will specify the incoming signals (voltages, bandwidth, etc.) as well as any outputs from the PCB that Hall D will require.

Agenda


Notes

Relevant Documents

Bandwidths

ActColBW.png PMT-5Rresp.png
Beam motion spectrum from the 2012 Hall B beam test
using the 1010 amplifier gain setting
Response spectrum of the PMT-5R amplifiers at various gain modes

Prototype System Diagram

Colli1.png