Difference between revisions of "BLTWG Meeting 01/09/2012"

From GlueXWiki
Jump to: navigation, search
(Agenda)
Line 7: Line 7:
 
# Announcements
 
# Announcements
 
# [http://zeus.phys.uconn.edu/halld/12GeVupgrade/Hall%20D%202012%20Change%20Request.xls Changes] to the [http://zeus.phys.uconn.edu/halld/12GeVupgrade/Tagger-beamline_baseline_sep2011.pdf Beamline Construction Schedule] - ''Tim''
 
# [http://zeus.phys.uconn.edu/halld/12GeVupgrade/Hall%20D%202012%20Change%20Request.xls Changes] to the [http://zeus.phys.uconn.edu/halld/12GeVupgrade/Tagger-beamline_baseline_sep2011.pdf Beamline Construction Schedule] - ''Tim''
# Discussion of the UConn SOW - ''Sascha, all''
+
# [[Media:SOW_UConn_ver1.docx | Discussion of the UConn SOW]] - ''Sascha, all''
  
 
===Notes===
 
===Notes===

Revision as of 12:28, 9 January 2012

  • Time: 11:30 EST
  • Place: ESNET and EVO (with telephone bridge id ???)
  • Connecting: instructions are here
  • Present:

Agenda

  1. Announcements
  2. Changes to the Beamline Construction Schedule - Tim
  3. Discussion of the UConn SOW - Sascha, all

Notes