Difference between revisions of "BLTWG Meeting 01/23/2012"
From GlueXWiki
(→Notes by R.J.) |
|||
(4 intermediate revisions by 3 users not shown) | |||
Line 2: | Line 2: | ||
* Place: ESNET and EVO (with telephone bridge id xxx) | * Place: ESNET and EVO (with telephone bridge id xxx) | ||
* Connecting: instructions are [[Tagged Beam Group Biweekly Meetings|here]] | * Connecting: instructions are [[Tagged Beam Group Biweekly Meetings|here]] | ||
− | * Present: | + | * Present: Igor S., Richard J., Curtis M., Alex S., Hovanes E., Tim W., Ivan T., Yi Q., Barry R., Dan S., Mike D., and Eugene C. |
---- | ---- | ||
Line 15: | Line 15: | ||
#* UConn microscope | #* UConn microscope | ||
#* CUA hodoscope | #* CUA hodoscope | ||
− | #* ASU polarimeter | + | #* [http://www.public.asu.edu/~dugger/polarimeter5.pdf ASU polarimeter] |
#* UNCW/JLab pair counters | #* UNCW/JLab pair counters | ||
#* JLab pair spectrometer, target | #* JLab pair spectrometer, target | ||
− | + | # [[Media:Timing_resolution_final.pdf | SiPM timing resolution studies ]] - ''Ivan/Alex'' | |
---- | ---- | ||
+ | |||
===Notes by R.J.=== | ===Notes by R.J.=== | ||
The beamline session this time should focus on construction activities over the coming year, and getting ready for our Readiness Review. Here is a draft list of things to be presented, and the groups that might be responsible for them. | The beamline session this time should focus on construction activities over the coming year, and getting ready for our Readiness Review. Here is a draft list of things to be presented, and the groups that might be responsible for them. | ||
Line 27: | Line 28: | ||
# Progress in polarimeter simulation - ''ASU'' | # Progress in polarimeter simulation - ''ASU'' | ||
# Tagging detectors construction plan - ''CUA'' + ''UConn'' | # Tagging detectors construction plan - ''CUA'' + ''UConn'' | ||
− | # | + | # Results for time resolution with SiPM's - ''JLab'' |
− | + |
Latest revision as of 12:57, 23 January 2012
- Time: 11:30 EST
- Place: ESNET and EVO (with telephone bridge id xxx)
- Connecting: instructions are here
- Present: Igor S., Richard J., Curtis M., Alex S., Hovanes E., Tim W., Ivan T., Yi Q., Barry R., Dan S., Mike D., and Eugene C.
Agenda
- Announcements
- Scope of Beamline Readiness Review 2012 - Alex
- Draft agenda for collaboration meeting - Richard
- Reports from working groups
- Glasgow goniometer + ladder
- UConn diamonds
- UConn electronics
- UConn microscope
- CUA hodoscope
- ASU polarimeter
- UNCW/JLab pair counters
- JLab pair spectrometer, target
- SiPM timing resolution studies - Ivan/Alex
Notes by R.J.
The beamline session this time should focus on construction activities over the coming year, and getting ready for our Readiness Review. Here is a draft list of things to be presented, and the groups that might be responsible for them.
- Beamline construction project overview - JLab
- Progress in diamond target fabrication - UConn
- Progress in polarimeter simulation - ASU
- Tagging detectors construction plan - CUA + UConn
- Results for time resolution with SiPM's - JLab