Difference between revisions of "BLTWG Meeting 01/23/2012"

From GlueXWiki
Jump to: navigation, search
(Agenda)
 
(3 intermediate revisions by 2 users not shown)
Line 2: Line 2:
 
* Place: ESNET and EVO (with telephone bridge id xxx)  
 
* Place: ESNET and EVO (with telephone bridge id xxx)  
 
* Connecting: instructions are [[Tagged Beam Group Biweekly Meetings|here]]
 
* Connecting: instructions are [[Tagged Beam Group Biweekly Meetings|here]]
* Present:  
+
* Present: Igor S., Richard J., Curtis M., Alex S., Hovanes E., Tim W., Ivan T., Yi Q., Barry R., Dan S., Mike D., and Eugene C.
  
 
----
 
----
Line 18: Line 18:
 
#* UNCW/JLab pair counters
 
#* UNCW/JLab pair counters
 
#* JLab pair spectrometer, target
 
#* JLab pair spectrometer, target
 
+
# [[Media:Timing_resolution_final.pdf | SiPM timing resolution studies ]] - ''Ivan/Alex''
 
----
 
----
  
Line 28: Line 28:
 
# Progress in polarimeter simulation - ''ASU''
 
# Progress in polarimeter simulation - ''ASU''
 
# Tagging detectors construction plan - ''CUA'' + ''UConn''
 
# Tagging detectors construction plan - ''CUA'' + ''UConn''
# Pair detectors construction plan - ''JLab'' + ''UNCW''
+
# Results for time resolution with SiPM's - ''JLab''
# Task list and schedule for Readiness Review - ''RJ / AS''
+

Latest revision as of 12:57, 23 January 2012

  • Time: 11:30 EST
  • Place: ESNET and EVO (with telephone bridge id xxx)
  • Connecting: instructions are here
  • Present: Igor S., Richard J., Curtis M., Alex S., Hovanes E., Tim W., Ivan T., Yi Q., Barry R., Dan S., Mike D., and Eugene C.

Agenda

  1. Announcements
  2. Scope of Beamline Readiness Review 2012 - Alex
  3. Draft agenda for collaboration meeting - Richard
  4. Reports from working groups
    • Glasgow goniometer + ladder
    • UConn diamonds
    • UConn electronics
    • UConn microscope
    • CUA hodoscope
    • ASU polarimeter
    • UNCW/JLab pair counters
    • JLab pair spectrometer, target
  5. SiPM timing resolution studies - Ivan/Alex

Notes by R.J.

The beamline session this time should focus on construction activities over the coming year, and getting ready for our Readiness Review. Here is a draft list of things to be presented, and the groups that might be responsible for them.

  1. Beamline construction project overview - JLab
  2. Progress in diamond target fabrication - UConn
  3. Progress in polarimeter simulation - ASU
  4. Tagging detectors construction plan - CUA + UConn
  5. Results for time resolution with SiPM's - JLab