Difference between revisions of "BLTWG Meeting 02/03/2014"

From GlueXWiki
Jump to: navigation, search
(Agenda)
m (Text replacement - "http://argus.phys.uregina.ca/cgi-bin/private" to "https://halldweb.jlab.org/doc-private")
 
(12 intermediate revisions by 3 users not shown)
Line 3: Line 3:
 
* Place: ESNET and [http://research.seevogh.com Seevogh] (Jlab community)
 
* Place: ESNET and [http://research.seevogh.com Seevogh] (Jlab community)
 
* Connecting: instructions are [[Tagged Beam Group Biweekly Meetings|here]]
 
* Connecting: instructions are [[Tagged Beam Group Biweekly Meetings|here]]
* Present:  
+
* Present: Richard J., James M., Alex B., Ann Marie C., Brendan P., Nathan S., Tim W., Alex D., Eugene C., Elton S., Jarrod , Alex S., Curtis M., Dan S., Franz K., and Mike D.
  
 
===Agenda===
 
===Agenda===
 
# Announcements
 
# Announcements
# Update from Accelerator Division - ''Todd''
 
 
# [[GlueX-Collaboration-Feb-2014|Collaboration Meeting]] Beamline Session - ''Richard''
 
# [[GlueX-Collaboration-Feb-2014|Collaboration Meeting]] Beamline Session - ''Richard''
 
# Update on mapping the tagger and PS - ''Tim''
 
# Update on mapping the tagger and PS - ''Tim''
# [http://faculty.cua.edu/sober/HallD/mapping/ Analysis of Tagger Map Data] - ''Dan''
+
# [http://faculty.cua.edu/sober/halld/mapping/field_mapping.ppt  Tagger Field Mapping talk draft] - ''Dan''
 
# Update on diamonds - ''Richard''
 
# Update on diamonds - ''Richard''
#*[[private:loan_agreement_with_E6_2-3-2014|Proposed loan agreement with E6 (private)]]
+
#*[https://docs.google.com/document/d/1oPoJSzcfAff79xD0755rZ3SHYFCO6RwpAICyl501yhM/edit?usp=sharing Proposed diamond radiator fabrication schedule]
 
# Update on the fixed tagger hodoscope - ''Franz''
 
# Update on the fixed tagger hodoscope - ''Franz''
# [http://argus.phys.uregina.ca/cgi-bin/private/DocDB/ShowDocument?docid=2181 Update on the microscope construction] - ''Alex B.'', ''Ann Marie''
+
# [https://halldweb.jlab.org/doc-private/DocDB/ShowDocument?docid=2181 Update on the microscope construction] - ''Alex B.'', ''Ann Marie''
#* Update on power supplies for TAGM and active collimator preamps - ''Richard''
+
#* [[Tagger_Microscope#Light_yield_tests|Fiber light yield measurements]]
# Update on pair spectrometer detector - ''Alex''
+
# Update on pair spectrometer detector - ''Alex S.''
# Update on polarimeter - ''Mike''
+
# Update on polarimeter: [http://www.public.asu.edu/~dugger/screening.pdf Screening corrections] - ''Michael''
 
#''any other business''
 
#''any other business''
  
 
===Notes===
 
===Notes===

Latest revision as of 16:53, 24 February 2017

Organization

  • Time: 11:30 EST
  • Place: ESNET and Seevogh (Jlab community)
  • Connecting: instructions are here
  • Present: Richard J., James M., Alex B., Ann Marie C., Brendan P., Nathan S., Tim W., Alex D., Eugene C., Elton S., Jarrod , Alex S., Curtis M., Dan S., Franz K., and Mike D.

Agenda

  1. Announcements
  2. Collaboration Meeting Beamline Session - Richard
  3. Update on mapping the tagger and PS - Tim
  4. Tagger Field Mapping talk draft - Dan
  5. Update on diamonds - Richard
  6. Update on the fixed tagger hodoscope - Franz
  7. Update on the microscope construction - Alex B., Ann Marie
  8. Update on pair spectrometer detector - Alex S.
  9. Update on polarimeter: Screening corrections - Michael
  10. any other business

Notes